Residential Rate Impact – 5 MW program

Residential Rate Impact – 5 MW program. 80% Solar. Pilot $2.30 per year ($0.19/mo.). Total: 5 MW. 20% Wind.

Download Presentation

Residential Rate Impact – 5 MW program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Residential Rate Impact – 5 MW program 80% Solar Pilot $2.30 per year($0.19/mo.) Total: 5 MW 20% Wind * These figures are illustrative and are used in this study to determine orders of magnitude. These figures could be subject to change following more in-depth analysis of local system installation costs, costs of capital, etc.

  2. Estimated Cumulative Jobs and Economic Development Impacts by 2020 4 MW 1 MW Total analysis is based on the National Renewable Energy Laboratory’s (NREL) Jobs and Economic Development Impact (JEDI) tools. • * JEDI models assess cumulative impacts through a target year. Actual benefits from operations jobs and output would continue beyond 2020. • ** Jobs is measured in Job-years which refers to full-time equivalent for 1 year (i.e. 1 job-year = 2080 hours of employment)