1 / 10

Allentown Materials Corp. (B)

Allentown Materials Corp. (B). Evaluation of a Change Effort Did the managers select the right design solutions? Is the organization design changing in a way demanded by its environment?. Allentown Materials Corp. (B). Evaluation of a Change Effort

niabi
Download Presentation

Allentown Materials Corp. (B)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Allentown Materials Corp. (B) • Evaluation of a Change Effort • Did the managers select the right design solutions? Is the organization design changing in a way demanded by its environment?

  2. Allentown Materials Corp. (B) • Evaluation of a Change Effort • Are the methods by which the changes implemented effective in getting the commitment of people in the organization?

  3. Recommendations for Change • Increase integration by developing a project organization • Identify and develop integrators in marketing • Identify project teams for each project composed of appropriate level people • Top Team becomes Resource Allocation Team (RAT) • Quarterly project reviews with RAT • Eliminate present product review meetings • Are the methods by which the changes implemented effective in getting the commitment of people in the organization?

  4. Recommendations for Change • Communicate new project organization to division • Develop interpersonal competence of people to function in new organization • Train integrators • Develop effective project teams • Team-building for top management • Training and development in conflict management • Are the methods by which the changes implemented effective in getting the commitment of people in the organization?

  5. Recommendations for Change • Improve group/functional relations through special Inter-group Problem Solving Meetings • Top team to develop objectives and strategies for the division • Stronger, more personal

  6. Year Resistors 1990 1 1991 0 1992 4 1993 0 1994 6 Capacitors 0 0 0 0 3 Allentown EPD: New Products

  7. Styles1992 Forcing 3.1 Smoothing 3.0 Constructive 2.9 1994 2.8 2.5 3.5 Allentown EPD: Conflict Resolution Styles

  8. Allentown EPD 1994 • What did we miss?

  9. What is a Successful Change? • The future state is reached • Performance in the future state meets or exceeds expectations • Transition costs are managed and false starts are minimized • The organization is capable of continuing to change and improve

  10. Change Readiness • Ch = (D x F x P) > C • Ch = Change • D = Dissatisfaction with the status quo • F = Clear model or vision of future state • P = Planned process for managing change • C = Cost of change to individuals and groups

More Related