The Benefits of 5D BIM Cost Estimation

This Preconstrucudbc0udd9fon Esudbc0udd9fmaudbc0udd9fon Data Is Used By Designers, Engineers, And Other<br>Project Team Members To Make Informed Decisions In Terms Of Project Planning,<br>Cost Management,Purchase, Quality, Etc.

Download Presentation

The Benefits of 5D BIM Cost Estimation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE BENEFITS OF 5D BIM COST ESTIMATION HAVE BEEN HIGHLY RECOGNIZED IN THE AEC INDUSTRY +91 7350255855 www.nibt.education

  2. ABSTRACT With The Adop?on Of Level 3 BIM, Cost Es?ma?on Can Be Adopted Through 5D This Is Possible By Linking The 3D Model To An Es?ma?on Library Or Database 5D Es?ma?on Helps Project Stakeholders Understand The Project Be?er, And Collaborate Efficiently This Preconstruc?on Es?ma?on Data Is Used By Designers, Engineers, And Other Project Team Members To Make Informed Decisions In Terms Of Project Planning, Cost Management,Purchase, Quality, Etc.

  3. INTRODUCTION The benefits of 5D BIM cost es?ma?on have been highly recognized in the AEC industry It is undoubtedly helping project owners and stakeholders leverage faster project delivery, minimize cost, enhance produc?vity, and project quality The integra?on of design and cost-es?ma?on in preconstruc?on provides deeper analysis and project insight The effec?ve use and transference of data across the various project lifecycle creates a robust pla?orm to avoid project rework, data loss, etc

  4. It also helps project stakeholders build be?er bidding proposals, efficiently handle project execu?on, and ensure posi?ve project delivery Robust es?ma?ng so?ware can augment the complete process through data transparency, mi?gate errors & risks, etc. All this and more to ensure owners and project stakeholders can leverage be?er ROI

  5. 01 03 Good Hiring Managers Are Hard To Find, But It Is Something You Will Have To Work On 04 06 If You’re Looking For Them, They Are Looking Out For You As Well

  6. ADVANTAGES OF A FULLY CONNECTED BIM WORKFLOW BUILD BESPOKE INTERVIEW PITCHES FOR DIFFERENT EMPLOYERS BASEDON 5D COST ESTIMATION 01 Helps Es?mators Work More Efficiently Leverage Unprecedented Levels Of Informa?on To Enhance Collabora?on Enhance Overall Project Performance Through Design & Construc?on Linking Be?er Project Visualiza?on Based On Accurate Es?ma?on Augment Quan?fica?on Of Modeled Materials Find Op?mal Accuracy And Solu?on In Calcula?ng Costs And Planning The Highly Visual Process Makes It Easier For Es?mators To Understand New Processes And Technology 01 Generate Greater Cost Es?mates At Quick Rates Create & Deliver Precise Data For Planning And Field Implementa?on

  7. BUILD BESPOKE INTERVIEW PITCHES FOR DIFFERENT EMPLOYERS ALONG THESE LINES, ACCURATE ESTIMATION THROUGH HIGH-END SOFTWARE HELPS CREATE SEAMLESS WORKFLOWS ACROSS ALL THE PROJECT LIFECYCLES THIS IS ACHIEVED THROUGH 02 01 03 Validating data Template building Data filters Built-in cost libraries Information reuse

  8. HOW DOES 5D COST ESTIMATION WORK? 03 Build Automated Es?ma?ons Based On Access From 3D Models – Accuracy Eliminates Errors And Rework Increase In Overall Accuracy Based On Automated Data Processing Leverage Historical Cost Data Based On 3D Takeoffs Connect Data Across Various Systems For Project Planning, Cost Management, Etc. Cost Management Tools Can Be Used To Verify 5D Es?ma?on Data Based On Comparisons Between Budgeted Data And The Actual Amount Gain Greater Insight Into The Project Through Accurate 5D Cost Es?ma?on On-Site Personnel Has The Ability To Leverage Building Strategies And Gain Insights Through Real-Time Informa?on On Materials, Costs, Etc.

  9. UNDERSTANDING DESIGN AND CONSTRUCTION AS AN INTEGRATED SYSTEM 03 It Is Important To Iden?fy A Very Strong Rela?onship Between Design & Construc?on, It Can Be Best Viewed As An Integrated System That Said, The Design Creates A Highly Detailed Descrip?on Of A Building, Facility, Infrastructure, Etc Based On Models, Plans, Etc. Whereas, Construc?on Planning Involves The Iden?fica?on Of Ac?vi?es And Resources To Make These Projects A Reality

  10. VARIOUS CHARACTERISTICS NEED TO BE CONSIDERED BASED ON DESIGN AND CONSTRUCTION 03 Every building, infrastructure, or facility is unique and requires custom designing Every project takes a specific ?me to complete Design & construc?on for a specific project need to sa?sfy certain condi?ons The service life or sustainability of a building, infrastructure, or facility is long Project complexi?es can cause changes in designs during the construc?on phase The integra?on of 5D cost-es?ma?on at the design and construc?on phase creates a robust design and construc?on workflow and mi?gates most of the challenges based on rework, budget and ?me overruns, etc.

  11. THE COST –ESTIMATION WORKFLOW 01 03 02 Prepare a plan to begin the estimation Create an estimate 03 04 Enhance the estimation technique Manage your estimates

  12. PREPARE A PLAN TO BEGIN THE ESTIMATION 01 03 02 The Primary Objec?ve Of The Project Team Would Be Se?ng A Defini?on Through A Broad Vision Iden?fy Resources To Begin The Es?ma?on Iden?fy Any Kind Of Constraint Build A Project Charter Or Ini?a?on Document Iden?fy People For Budget Management & Approval

  13. PREPARE AN ESTIMATE 01 03 02 Use Various Cost Es?ma?on Techniques To Create And Maintain A Budget Leverage Policies, Market Condi?ons, Templates, Etc., To Build An Es?mate Build Es?mates Based On Parametric And Analogous Es?ma?on Use WBS Or Work Breakdown Structure Using The Scope And Dura?on Cost Baselines Are The Approved Time-Phased Budget And Will Be Leveraged By The Project Manager To Manage The Complete Es?ma?on Process

  14. THE COST –ESTIMATION WORKFLOW - Manage your estimate – 01 03 02 The Project Manager Is Responsible To Oversee Various Phases Of The Cost Es?ma?on Process Specific Cost Es?mates Can Be Factored In The Project Execu?on Phase Based On Specific Costs From Vendors, Required Resources, Etc. This Helps Project Managers Convey Transparent Informa?on And Manage Be?er Stakeholder Communica?on

  15. VARIOUS COST ESTIMATION TECHNIQUES 5D Cost Estimation can be achieved through various techniques viz. 01 03 02 01 02 03 Bottom-Up Estimation Analogous Estimation Statistical Estimation Determine Es?ma?on Based On Individual Work Or Tasks Use Historical Data To Determine Project Costs In The Early Stages Of The Project Determine Es?ma?on Based On Parametric Calcula?ons 04 06 05 Three-Point Estimation Reserve Analysis Cost of Quality Determine Es?ma?on Based On Expenses Duringthe Project To Prevent Failures And Expenses Done A?er The Project To Focus On Failures Determine Es?ma?on Based On 3 Techniques Viz.Op?mis?c, Most Likely, And Pessimis?c Determine Es?ma?on Based On Reserves That Need To Be Kept Aside Or Allocated

  16. CONCLUSION Using 5D Cost Es?ma?on Across The En?re Project Lifecycle, Es?mators Or Es?ma?on Companies Can Save On Valuable Time And Cost The BIM Es?ma?on Advantage Lets Stakeholders View The Model Along With The Necessary Schedules This Ensures All The Teams Get A Clear Grasp Of How Changes Can Affect The Cost Cycle And Vice-Versa Based On Invaluable Informa?on BIM Es?ma?on From Design To Construc?on Always Works Towards Owner And Stakeholder Advantage