1 / 2

Establish a Computerised Information & Reservation System for Rail Transport,

TAP TSI is about telematics applications for passenger services and addresses several PRR and Interoperability Directive requirements. Passengers’ Rights Regulation (EC) No 1371/2007. Interoperability Directive 1 2008/57/EC. Extracts. Establish a Computerised Information &

nico
Download Presentation

Establish a Computerised Information & Reservation System for Rail Transport,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TAP TSI is about telematics applications for passenger services and addresses several PRR and Interoperability Directive requirements Passengers’ Rights Regulation (EC) No 1371/2007 Interoperability Directive12008/57/EC Extracts Establish a Computerised Information & Reservation System for Rail Transport, providing customers, amongst others, with: • Pre-journey customer information, e.g. • Time schedules and conditions for the fastest trip and lowest fare • Accessibility, availability • Information during the journey • On-board services • Next station, delays, connecting services • Implement applications for passenger services, for instance: • Systems providing passengers with information before and during journey • Reservation and payment systems • Develop databases, software, data protocols in a manner allowing maximum data exchange between different applications and operators In force since 13 May 2011 Commission Regulation (EU) No 454/2011 1) Primary legal basis for TAP TSI

  2. The first phase of TAP TSI implementation is ongoing and organised through the TAP Phase One project Implementation Phases Phase One:Preparation Phase Two:Development Phase Three: Deployment May 2011 May 2012 tbd tbd • Steering Committee established, 4 meetings between end-May and end-November 2011 • Project Team of rail and ticket vendor1 representatives operational since July • Intensive stakeholder engagement, but Member States support needed • COM co-funding, ERA monitoring • Expected deliverables: • Functional, technical and performance specifications; associated data; interface, quality, security requirements • Architecture outline • Implementation master plan • Governance • Milestones: • Monthly: Project Manager’s progress report • 13 November 2011:RUs to publish certain information on their websites • 8 December 2011: Intermediate report • 13 May 2012: Deliverables • 13 July 2012:ERA recommendation on deliverables 1) Travel technology providers, (online) travel agencies, tour operators etc.

More Related