V0 electronics milestones. End 2004: electronics concept finalization (PMT, ‘shoebox’, FEE) CIU design prototype in test (charge, time, pre-process of triggers) January 2005: CCIU and TTCIU prototype design started (final trigger signal, collection of the data, …interface TTC/FEE)

nicola
Download Presentation

V0 electronics milestones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. V0 electronics milestones • End 2004: electronics concept finalization(PMT, ‘shoebox’, FEE) CIU design prototype in test(charge, time, pre-process of triggers) • January 2005: CCIU and TTCIU prototype design started (final trigger signal, collection of the data, …interface TTC/FEE) • July 2005: CCIU and TTCIU prototype realization • End 2005: CIU, CCIU, TTCIU protypes tested Design review • January 2006: CIU, CCIU, TTCIU final design starting • June 2006: electronics construction • End 2006: electronics test, calibration, connection to CTP electronics ready for installation in ALICE • Engineers: Y. Zoccarato, W. Tromeur, C. Combaret FEE meeting, 10 December 2004

More Related