An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CVE 4070 Construction Engineering Project Closeout & Pyramid Solution Prof. Ralph V. Locurcio, PE

  2. Project Closeout-1 • PM Responsibilities • Manage closeout inspection process • Ensure final construction details done • Ensure testing completed • Ensure as-builts completed & filed • Schedule occupancy • Monitors site cleanup • Make final payments

  3. Project Closeout-2 • Project Documentation • Prep & deliver O&M manual • Establish project files; RFI’s, Changes, Payments, Vendor info, Shop Drawings. • As-built drawings to user & archive

  4. Project Closeout-3 • Transfer Project to Owner/User • Train O&M personnel on systems • Complete punch list items • Conduct walk thru with Owner/User • File warranties with Owner/User • Cover any life safety issues • Complete transfer documentation

  5. The First Pyramid Solution

  6. Pyramid Solution-1

  7. Pyramid Solution-2

  8. Pyramid Solution-3