20 likes | 166 Views
T1 & T2 prep. T1: 31kHz, 5 degree readout, 220 15 ms chs4R20 for inversion TI(500 ms). 256 readout projections T2: 31 kHz, 5 degree readout. 4 X 220 12.5 ms chs4R20 with MLEV phasecycling. 128 readout projections Resolution 1.17 mm isotropic.
E N D
T1 & T2 prep T1: 31kHz, 5 degree readout, 220 15 ms chs4R20 for inversion TI(500 ms). 256 readout projections T2: 31 kHz, 5 degree readout. 4 X 220 12.5 ms chs4R20 with MLEV phasecycling. 128 readout projections Resolution 1.17 mm isotropic. The images are slice averaged, but the movies are not