960 likes | 1.17k Views
UFE 2004 ANALYSIS. Compiled by Load Profiling ERCOT Energy Analysis & Aggregation. Sources of UFE include: ■ Generation Measurement Errors ■ Load - Missing/Erroneous Usage Data - Model Error - Load Profile ID Assignment Error ■ Losses - Model Error
E N D
UFE 2004 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Sources of UFE include: ■ Generation Measurement Errors ■ Load - Missing/Erroneous Usage Data - Model Error - Load Profile ID Assignment Error ■ Losses - Model Error - Loss Code Assignment Error UFE Basics • UFE (unaccounted for energy) is computed as follows: UFE = Generation – (Load + Losses) • Negative UFE indicates load/losses are overestimated
UFE GAP - - - - - - > Losses: Transmission & Distribution Profiled Energy Usage Non-Interval Data Non-Metered Accounts Interval Data Energy Usage UFE Basics Net Generation forSettlement Interval Net Generation Compared to Load Buildup
Final Settlement Initial True-Up DATA VERIFICATION IN THE SETTLEMENT PROCESS UFE is computed for each 15-minute interval of a settlement run. • Initial Settlement(posted on day 10 after the operating day) • Final Settlement (posted on day 60 after the operating day) • True-up Settlement (posted 6 months after operating day) • Resettlement statement (posted as needed)
Load Weighted Calculation of MCPE • Market Clearing Price for Energy (MCPE) isthe highest price by Congestion Zone for a Settlement Interval for Balancing Energy deployed during the Settlement Interval. • In 2004 there were 5 congestion zones – E04, H04, N04, S04 and W04. • The load weighted MCPE is calculated for each 15 min. interval using the LCMZone cuts as follows: MCPE_LWTD = ((LCMZone_E04_Mwh * MCPEL_E04) + (LCMZone_H04_Mwh * MCPEL_H04) + (LCMZone_N04_Mwh * MCPEL_N04) + (LCMZone_S04_Mwh * MCPEL_S04) + (LCMZone_W04_Mwh * MCPEL_W04)) / (LCMZone_E04_Mwh + LCMZone_H04_Mwh + LCMZone_N04_Mwh + LCMZone_S04_Mwh + LCMZone_W04_Mwh)
ABS UFE Mwh by Month Initial, Final and True Up Settlements SR09a
UFE Cost by Month Initial, Final and True-UP Settlements SR09b
Percent Distribution of Total UFE (MW) Initial to Final - 2004 UFD01
Percent Distribution of Total UFE (MW) Final to True-Up - 2004 UFD02
UFE Percent of ERCOT Load – Initial Settlement 95% Confidence Interval CIP01
UFE Percent of ERCOT Load – Final Settlement 95% Confidence Interval CIP02
UFE Percent of ERCOT Load – True-Up 95% Confidence Interval CIP03
Comparison of Medians With 95% Confidence Interval CIP04