1 / 18

Ground Systems Industrial Enterprise

Leadership Teaming Communication Employee Support Strategic Thinking Organizational Climate . Ground Systems Industrial Enterprise. Transforming the Industrial Base. T ank-automotive & A rmaments COM mand. Outline. GSIE overview, capabilities, and intent

niveditha
Download Presentation

Ground Systems Industrial Enterprise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Leadership Teaming Communication Employee Support Strategic Thinking Organizational Climate Ground Systems Industrial Enterprise Transforming the Industrial Base Tank-automotive & Armaments COMmand

  2. Outline • GSIE overview, capabilities, and intent • Initiatives to date • Legislative reform • Financial reform • Lean initiatives • Workforce revitalization • Infrastructure reduction • Summary

  3. GSIE Overview • Combines the capabilities of Anniston, Red River, and Sierra Army Depots, Rock Island and Watervliet Arsenals, and the Lima Army Tank Plant into a single Enterprise • Designed to leverage the capabilities of the ground systems industrial base • Goal is to continuously improve support to soldiers while reducing the cost of products and services to a level comparable with industry without the need for subsidies

  4. GSIE Capabilities • Engineering and Prototyping • Manufacturing • Maintenance and Overhaul • Field Services

  5. Engineering and Prototyping • Product Design and Development • Rapid Prototyping • System/Component Simulation • CAD/CAM/CIM (Unigraphics/ProE/Autocad) • Dynamic/Stress Analysis • Material Testing • Chemical Analysis • Oil and Lubrication • Metallurgical/Rubber • Manufacturing Support • Product Redesign/Improvement • Lean/Six Sigma/ABC

  6. Manufacturing • Precision Machining • 7-axis Machining Centers • CNC/Automated Cellular/Flexible Machining • Fabrication/Assembly • Welding (Robotic, Submerged, Orbital, etc.) • Ferrous, Non-Ferrous, Composites, Rubber, and Titanium • Casting/Forging • Cannon Tubes • Ferrous, Non-Ferrous, and Titanium • Heat Treatment/Plating/Finishes • Cylinder/Cannon Tube Chrome Plating • Chemical Agent Resistive Coating (CARC) Painting • Tool, Die, and Gage

  7. Maintenance and Overhaul • Systems/Subsystems Support • Wheeled and Tracked Vehicles • Self-Propelled and Towed Artillery • Small Arms and Mortars • Major Subsystems (engines, transmissions, etc.) • Optics/Electronics • Night Vision • Radiological • Circuit Cards • Unique Processes • Robotic Metal Spray • Rubber Denuding • Testing • Gymnastication/Live-Fire/Test Track • Engine/Transmission/Hydraulic Component Test Facilities

  8. Field Support • Forward Repair Facilities/Teams • Modifications/Upgrades • Failure Analysis • Testing (laboratory and simulation) • Spare/Repair Parts • Reverse Engineering • Rapid Prototyping • Receipt, Storage, and Issue of Equipment • Manual and Automated Storage/Retrieval Systems • Open-air and Enclosed Facilities • Environmentally Controlled and High Desert Storage

  9. Capabilities Summary • Cradle to grave capability • Full range of processes and materials • Current, interim, and future systems • Leading edge of new technologies • Partnerships to meet the Warfighter’s needs • Private industry • Win-win for government and industry • Flexible infrastructure • Ability to meet any requirement

  10. GSIE Intent • To grow the workload at each installation, not rearrange existing workload • To clarify and simplify the rules under which we operate • To make the rules applicable to all • To advance public/private partnerships • To increase efficiency • To reduce capital expenditures

  11. Initiatives to Date • Established organization 7 October 2002 • Formed Corporate Board of Directors and Leadership Council • Approved as Business Initiatives Council (BIC) initiative (legislative and financial reform) • Implementing lean and other efficiencies • Revitalizing the workforce • Focusing on quality • Integrating engineering and production • Pursuing additional workload • Looking at footprint reductions

  12. Legislative Reform • 11 statutes currently affect business, 3 prominently • Introduced by different Congressmen for different reasons • All offer benefits for some installations, but not all • Variance causes confusion, uncertainty, and program delays • New legislation being offered that combines the best of each into a single statute • Clarifies the rules and applies them to everyone • Intended to facilitate more public/private partnerships • Firm fixed prices, multi-year contracts, variable costing

  13. Financial Reform 14 Army Working Capital Fund (AWCF) Business Initiatives Council (BIC) reforms • Examples • Return of financial gain • Capital investment authority • Depreciation rules • Capacity measurement • Removal of material costs from rates • Metrics

  14. Sample of Lean Projects SIAD CLASS VIII MEDICAL SUPPLIES (COSIS) ANAD AVDS 1790 RECIPROCATING ENGINE PROCESS • Eliminating excess handling and eliminating non-value added movement of materials • Cost avoidance: $4.2M • Turn-around Time: 62 days down to 36 days • Labor efficiency: 33% Improvement • Now, AVDS 1790 is part of entire reciprocating engine process, exporting gains to 6V53, M903, 8V71, and APU. RIA FORWARD REPAIR SYSTEM • Travel distance reduced by 35% • Labor efficiency: 14% Improvement WVA RRAD LEAN PROJECTS SEE VEHICLE RECAP PROCESS • Cost avoidance: T-53 and 81mm Mortar with a savings of $330K. • Weapon System Lead Time process will use 120mm M256 Cannon as pilot project to reduce weapon system lead times • Cost avoidance: $4.3M • Monthly output up 30% • Labor hours per engine: 34% reduction

  15. Staffing Initiatives andWorkforce Revitalization Efforts • LEAN staffing process • Reviewing each vacancy at command level • Reallocating or reengineering as required • Targeting 2 for 3 direct replacements and 1 for 3 indirect • Workforce revitalization • Apprentice program • Co-op program • Student employment program • Worker trainees • Temporary hires and terms employees to enhance flexibility • Efforts and results • Working toward 75/25 percent direct/indirect ratio • Reducing average age of employees • Reducing average length of service • Trends going in right direction

  16. Average Age

  17. Examples of Infrastructure Reductions • Watervliet Arsenal • 290,000 square feet of floor space • 525 pieces of industrial plant equipment • Potential for more • Rock Island Arsenal • 700,000 square feet of floor space • 683 pieces of industrial plant equipment

  18. Summary • Leverages the government-owned industrial capability • Grows the workload at each installation • Reduces unit prices to customer • Eliminates the need for any subsidy • Revitalizes the workforce • Fosters more public/private partnerships

More Related