1 / 20

The Bandra-Worli Sealink

The Bandra-Worli Sealink. The Bandra- Worli Sea Link. INAUGURATION June 30, 2009 Landmark for Mumbai city Among the most complex & advanced construction projects ever in India Major project in Mumbai metropolitan region after Mumbai-Pune expressway. Project.

nizana
Download Presentation

The Bandra-Worli Sealink

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Bandra-Worli Sealink

  2. The Bandra- Worli Sea Link • INAUGURATION June 30, 2009 • Landmark for Mumbai city • Among the most complex & advanced construction projects ever in India • Major project in Mumbai metropolitan region after Mumbai-Pune expressway

  3. Project Sea link project conceived in the 1990s Plagued by PILs- fishermen & environmentalists 2004- Work started But drastic changes to 80% of the bridge design Cost escalation from Rs 350 crore to Rs 1,306 crore to Rs 1,634 crore MSRDC project Executed by Hindustan Construction Company Illumination by Bajaj Electricals, Rs 9 crore

  4. Location • Built over the Mahim Bay • Connects Bandra(suburb) to Worli(central Mumbai) • 8-lane-wide • Sea link length- 5.6-km, 3.8 km over the sea

  5. Facts Height of the cable-stayed tower = 43-storey building Weight= 50,000 African elephants Steel wire used= circumference of the earth Cement used- 90,000 tons 16 lanes toll plaza, at the Bandra end

  6. How the Sea-Link Helps Additional connectivity from city to suburbs Reduces travel time from 1 hour+ to only 7 minutes Decongests Mahim Causeway- 125,000 vehicles a day Avoids 29 traffic lights Save Rs 100 crore a year in vehicle operating costs

  7. Problems Perceived • Major traffic snarls at Worli, no solution figured out • Additional congestion on SV road and across Lilavati Hospital • Toll proposed- Rs 50 oneway, may dissuade a few

  8. Landmark Hot tourist spot Key destination in 'Mumbai Darshan' package Special open BEST buses between BKC & Worli sea face 8-lane bridge, with 2 dedicated bus lanes

  9. Mini-UN Engineering team from   China, Egypt, Canada, Britain, Serbia, Switzerland, Singapore, Thailand, Hong Kong, Indonesia and Philippines worked on the project

  10. FORWARD THIS TO AS MANY MUMBAIKARS AS YOU CAN -VIRAL GANDHI – 090 16 327 309.

More Related