Development of Vibration Isolation Systems for KAGRA

This article discusses the progress made in the development of vibration isolation systems, including cryogenic payload, for the KAGRA project, a second-generation interferometric gravitational wave detector in Japan. The article covers the introduction, vibration isolation, cryogenic payload, and a summary of the development.

nmiranda
Download Presentation

Development of Vibration Isolation Systems for KAGRA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of vibration isolation systems for LCGT VII K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA, H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ, N.A. LockerbieK, LCGT collaboration ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK 2012 March 24 The meeting of Physical Society of Japan @Kwansei Gakuin University, Nishinomiya, Hyogo

  2. Development of vibration isolation systems for KAGRA VII K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA, H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ, N.A. LockerbieK, LCGT collaboration ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK 2012 March 24 The meeting of Physical Society of Japan @Kwansei Gakuin University, Nishinomiya, Hyogo 2

  3. 0. Abstract Progress of development of vibration isolation system, which includes cryogenic payload, for KAGRA in the last half year

  4. Contents • Introduction • Vibration isolation • Cryogenic payload • Summary

  5. 1. Introduction KAGRA (previously known as: LCGT) 2nd generation interferometric gravitational wave detector in Japan Key features of KAGRA project Silent underground site (Kamioka) : Small seismic motion reduced requirements for vibration isolation system. Cryogenic system : Reduction of thermal noise and so on

  6. 1. Introduction Type-A IP + GASF (5 stage) + Payload (23kg, cryogenic) Type-B IP + GASF (3 stage) + Payload (10kg/20kg) Type-C Stack + Single/Double-pendulum (~1kg)

  7. 1. Introduction Type-C Stack Mirror

  8. Type-B Top filter [Filter0] Pre-isolator Inverted Pendulum (IP) Filter chain Filter1 (Filter1~3 in Type-A) Bottom Filter (BF) Intermediate Mass (IM) Intermediate Recoil Mass (IRM) Payload Test Mass(TM) Recoil Mass (RM) Optical Bench [Breadboard]

  9. 1. Introduction Type A and Cryo payload 14m in height Vibration Isolation (Type A) Cryostat Cryogenic mirror 9

  10. 1. Introduction Cryo payload Shield (8K) Sapphire fiber Sapphire mirror (20K)

  11. 1. Introduction Schedule for vibration isolation system of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 - Prototype test (ICRR and NAOJ) : - 2014.3 Pre-isolator : 2011.7 – 2012.9 Type B payload : 2012.7 - 2013.6 Type B : 2013.1 - 2014.3 Assembling (Akeno and Kamioka) : 2012.4 - 2014.9 Standard GASF : 2012.4 – 2012.9 Installation (Kamioka) : 2014.4 - 2016.5 Type B (for iKAGRA) : 2014.4 - 2015.6 Type A and Type B (for bKAGRA) : 2015.5 - 2016.5

  12. 1. Introduction Schedule for cryogenic payload of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 - 1/4 cryostat and R&D : - 2014.9 Design for cryostat and payload : Now Cryostat installation in ICRR (Kashiwa) : 2013.3 Experiment of 1/4 cryostat : 2013.4 - 2014.9 Procurement : 2014.10 - 2015.6 Installation : 2015.8 - 2016.12

  13. 2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR) Complete system Details of experimental test will be reported by T. Sekiguchi (next talk !).

  14. 2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR) Pre-isolator Pre-isolator load 14

  15. 2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR) Standard GASF (prototype) (production) 15

  16. 2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR) Digital system has already been installed (O. Miyakawa’s talk in this session).

  17. 2. Vibration isolation Storage & Assembling • Delivered apparatus will be assembled in clean booths and stored in Akeno observatory (ICRR), Yamanashi.

  18. 2. Vibration isolation • 19 standard GASF’s • from Italy and clean booths arrived. • We will start assembling soon. Akeno Lucca (Italy)

  19. 3. Cryogenic payload Preparation for 1/4 cryostat Design of 1/4 cryostat is in progress. Preliminary. 19

  20. 3. Cryogenic payload Preparation for 1/4 cryostat Design of cryogenic payload is in progress. Preliminary. 20 http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=570

  21. 3. Cryogenic payload Preparation for 1/4 cryostat Themal and mechanical simulation of payload (S. Koike and T. Sekiguchi) 21

  22. 3. Cryogenic payload Preparation for 1/4 cryostat (C. Tokoku) Cryocoolerhas already arrived at ICRR ! 22

  23. 3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

  24. 3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors Test sample (T. Uchiyama)

  25. 3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors Sapphire fibers from MolTech GmbH (Germany) Length = 350 mm diameter = 1.8 mm) Almost as needed in bKAGRA. Need to check the quality. 25

  26. 3. Cryogenic payload Baffle for the (large angle) scattered light Design from Mike Smith – Caltech (support from LIGO and U.S. National Science Foundation ) Needs suspension inside radiation shield !

  27. 3. Cryogenic payload Digital system for temperature monitor Discussion is in progress.

  28. 4. Summary Vibration isolation Prototype test in Kashiwa : pre-isolator (Sekiguchi and Miyakawa’ talk) Assembling of Standard GASF in Akeno is started soon. Cryogenics payload Design of the 1/4 cryostat and payload are in progress. Cryocooler for 1/4 cryostat and test samples of sapphire fibers arrived. Discussion for baffle in cryostat and digital system are being discussed.

  29. Thank you for your attention !

  30. 4. Summary Plan for next half year Vibration isolation Prototype test : pre-isolator and payload Assembling in Akeno : Standard GASF Cryogenics payload Design of the 1/4 cryostat and payload

  31. 2. Issues (1)How to assemble Details of construction, clean room …. (2)Strength Tensile strength, development of clamp, … (3)Control system Actuators (what and where), resonant mode (frequency and Q)

  32. 2. Issues (4)Cooling Temperature of mirror, initial cooling time, heat resistance … (5)Noise Thermal noise, vibration via heat links …

  33. 4. Summary Cryogenic payload : One of key features of LCGT project Cryogenic part of seismic isolation system Cryostat installation in ICRR (Kashiwa) ~2013.3 (Check of cryostat system) Check of cryogenic payload in ICRR Preparation is in progress. (1)Thermal simulation (2)Sapphire fiber-mirror connection (3)Simulation of effect of external vibration (with heat link) (4)Thermal noise

  34. 5. Future work (1)How to assemble Details of construction, clean room …. (2)Control system Actuators (what and where), resonant mode (frequency and Q)

  35. Type-B Inverted pendulum Top filter 2-stage GASF Mirror

  36. 1. Introduction Schedule along roadmap iKAGRAoperation

  37. Configuration Type-A: IP + GASF (5 stage) + Payload (23kg, cryogenic) Type-B: IP + GASF (3 stage) + Payload (10kg/20kg, room temp.) Type-C: Stack + Single/Double-pendulum (~1kg)