1 / 7

STATUS OF IMPLEMENTATION: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF 2008)-PDA

STATUS OF IMPLEMENTATION: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF 2008)-PDA. ILEMBE DISTRICT MUNICIPALITY 25 JUNE 2010. Content of the Presentation:. Introduction of the Region/ILembe Shared Services. Relations to the Locals- implementation process. Application Process Manual

noam
Download Presentation

STATUS OF IMPLEMENTATION: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF 2008)-PDA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATUS OF IMPLEMENTATION: KWAZULU-NATAL PLANNING AND DEVELOPMENT ACT (NO. 6 OF 2008)-PDA ILEMBE DISTRICT MUNICIPALITY 25 JUNE 2010

  2. Content of the Presentation: • Introduction of the Region/ILembe Shared Services. • Relations to the Locals- implementation process. • Application Process • Manual • Delegations • Tariffs

  3. Introduction:The ILembe District has implemented Shared service department to facilitate the implementation of the PDA.

  4. Preparations I.T.O. ACT: • Functional Planning forum:- dealing with- Development Administration, PMS Shared service, Alignment with other sector departments and information sharing • Alignment :- LUMS:- Mandeni:- Process of finalising the draft Scheme that covers the whole municipal area Maphumulo:- Process of finalising the scheme for Maphumulo Town and establishment of Town Ndwedwe:-Preparation of Land Use Management System (LUMS). KwaDukuza:-has a draft consolidation of the Schemes. Interaction with COGTA :- focused training on schemes. • Delegation • Tariffs

  5. Application process: • Pre-consultation meeting • Checklist • Developers guide to development

  6. Manual: • Place flow diagram here • attached : - manual • Guide for Roles and Responsibilities (PDA)

  7. S’busiso Dlamni Chief Planner Sibusisod.dlamini@ilembe.gov.za 032 947 9819 071 875 0361 RenneHulley Manager IDP and Planning Renne.hulley@ilembe.gov.za 032 947 9801 Thank you! Nomfundo Thabethe Nomfundo.thabethe@mandeni.gov.za Senior Planner 032 456 8200 ZafikaMazibuko Young Professional Planner zafikam@dbsa.org 032 947 9819 071 875 0361 Anton Meintjes Town Planning Specialist antonm@dbsa.org 032 947 9820