Sharing The Vision FACILITIES School Board Member Joie Cadle Dr. Patrick Herron

Sharing The Vision FACILITIES School Board Member Joie Cadle Dr. Patrick Herron. October 12, 2005 3-7:30 p.m. BOONE HIGH 2000 S. Mills Ave., Orlando 32806 (SE). Operations & Maintenance FACTS. MAINTAINING OVER 200 FACILITIES (23 MILLION SQUARE FEET) PROVIDING:

noel
Download Presentation

Sharing The Vision FACILITIES School Board Member Joie Cadle Dr. Patrick Herron

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sharing The VisionFACILITIESSchool Board Member Joie CadleDr. Patrick Herron October 12, 2005 3-7:30 p.m. BOONE HIGH 2000 S. Mills Ave., Orlando 32806 (SE)

  2. Operations & Maintenance FACTS • MAINTAINING OVER 200 FACILITIES (23 MILLION SQUARE FEET) PROVIDING: • ASSESSMENT/REPAIR (100,000 WORK REQUESTS/YR) • PREVENTIVE MAINTENANCE OF FACILITIES & KEY COMPONENTS • INTEGRATED FACILITIES PLANNING (IFP) • Catalog and document the key components in each facility • Determine current condition of each key component and predict expected life • Determine the future capital requirements for existing and new facilities • Develop the foundation for recommended capital reinvestment plans for future years • REINVESTMENT OF PUBLIC EDUCATION CAPITAL OUTLAY FUNDS (PECO) • 4,500 ACRES OF GROUNDS AND LAWN-CARE • LEADING CUSTODIAL OPERATIONS, PROVIDING • SITE ASSESSMENT, EMPLOYEE TRAINING, EQUIPMENT REPAIR • PROVIDING CAPITAL RENEWAL SERVICES • OVER 1,000 CAPITAL PROJECTS ANNUALLY TO: • IMPROVE LIFE SAFETY • UPGRADE BUILDING COMPONENTS • REFURBISH AND RENOVATE OCPS FACILITIES

  3. Operations & Maintenance FACTS • OVER 4,300 PORTABLE CLASSROOMS • 193 LOCATIONS • 4 MILLION SQUARE-FEET OF CLASSROOM SPACE • INSTALLING OVER 400 ADDITIONAL (GROWTH PORTABLES) PER-YR • PORTABLE CAMPUSES UTILIZED DURING COMPREHENSIVE RENOVATIONS • OVER $30 MILLION PER YEAR IN UTILITY COSTS • SAVED OVER $1 MILLION LAST YEAR; RETURNED 50% OF SAVINGS TO SCHOOLS • INNOVATIVE ENERGY CONSERVATION PROGRAMS UNDERWAY • GEOTHERMAL COOLING FOR SCHOOL AIR CONDITIONING • GREEN-BUILDING-TECHNOLOGY IN NEW SCHOOL DESIGN AND IMPROVEMENTS • BIO-DIESEL FUEL PRODUCTION AND SOLAR ELECTRIC/HOT-WATER DEMONSTRATION PROJECTS • SCHOOLS PRACTICE ENERGY CONSERVATION BY • SCHEDULING BUILDING OCCUPANCY (COOLING AND LIGHTING) • CONTROLLING CLASSROOM TEMPERATURES • TURNING OFF OFFICE AND IT EQUIPMENT WHEN NOT IN USE • PARTNERING WITH SCHOOLS AND UTILITY COMPANIES (THROUGH AN ENERGY CONSERVATION STEERING COMMITTEE) TO IDENTIFY FURTHER SAVINGS AND REINVEST FOR THE FUTURE.

  4. DESIGN & CONSTRUCTIONFACTS • Nine new schools opened August 2005. • 23 Major construction projects underway now. • One comprehensive project opens January 2006. Four comprehensive and eleven new or replacement schools are scheduled for August 2006 opening. • Two comprehensive projects open January 2007. Eight comprehensive and six new or replacement schools are scheduled for August 2007 opening. • Six comprehensive and three new or replacement schools are scheduled for August 2008 opening. • 2009 has four comprehensive and seven new or replacement schools scheduled for August opening. • Sales tax has provided $368,500,466 in the 31 months since it began in January 2003.

  5. 2006 COMPREHENSIVE PROJECTS

  6. 2006 NEW/REPLACEMENT SCHOOLS

  7. 2007 COMPREHENSIVE PROJECTS

  8. 2007 NEW/REPLACEMENT PROJECTS

  9. 2008 PROJECTS

  10. 2009 PROJECTS

  11. 2010 PROJECTS

  12. New Permanent Capacity • 2005 added 9,384 permanent student stations. • 2006 will add 1,356 permanent student stations as a result of comprehensive projects and 10,285 permanent student stations in new facilities. • 2007 will add 3,111 permanent student stations as a result of comprehensive projects and 3,991 permanent student stations in new facilities. • Total NEW permanent student stations added from 2005 to 2007 = 28,127.

  13. The Construction Bus Is Moving Along