1 / 15

Storage – Specific Safety Precautions

Storage – Specific Safety Precautions. Breakdown Operations. Breakdown Operations: Mitigation Examples. Breakdown Operations: Mitigation Examples. Free From Explosives(FFE). Found in a pile of FFE packages – how was this missed?. Free From Explosives(FFE) Process.

Download Presentation

Storage – Specific Safety Precautions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Storage – Specific Safety Precautions

  2. Breakdown Operations

  3. Breakdown Operations: Mitigation Examples

  4. Breakdown Operations:Mitigation Examples

  5. Free From Explosives(FFE) Found in a pile of FFE packages – how was this missed?

  6. Free From Explosives(FFE) Process • Treat as an explosive process • Risk assessment • Licensed site/building • In an area away from main explosives process area • Separate different types of item/pack/etc Isolated storage • Inspect all articles and packages • Thorough examination • Can FFE be stated with certainty? • Remove all HCC markings • Certificate states details of inspection • Inspector signs it • Copy attached to item • 2nd copy kept for 3 years

  7. Electro-Explosive Devices

  8. Health Hazards • Examples: Health hazards posed by explosives: • Toxic effects • Dermatitis • Severe headaches • Heart failure • Death

  9. Health Hazards • Awareness of hazards • Harm is a function of: • Concentration • Toxicity • Duration • Hazard Data Sheets from suppliers • Occupational Exposure Levels

  10. Health Hazards

  11. Phosphorous Ammunition

  12. Phosphorous Ammunition: Some Mitigation Measures • Temperature as low as possible (certainly < 40ºC) • Do not expose to sunlight • Stacking < 1.5m high • Passages for inspection and removal of containers • Regular inspection regime (temperate <7 day interval) • Trained personnel to handle leaking munitions

  13. Phosphorous Ammunition: Some Mitigation Measures • Leaking munitions: isolate and keep under water • Suitable, large container full of clean water • First aid instructions, equipment and plan • Ventilation for red phosphorous munitions

  14. Permits to Work

  15. Questions

More Related