1 / 7

ISO/IEC JTC1 SC25 WG3 Review for WG1

SC25 WG1 N1637. ISO/IEC JTC1 SC25 WG3 Review for WG1. October 01, 2013 Kista , Sweden. 1. Overview . ISO/IEC JTC1 SC25 WG3: Interconnection of information technology equipment , Information & Communication Technology (ICT) Cabling Systems for Buildings,

noma
Download Presentation

ISO/IEC JTC1 SC25 WG3 Review for WG1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC25 WG1 N1637 ISO/IEC JTC1 SC25 WG3Review for WG1 October 01, 2013 Kista, Sweden ISO/IEC SC25 WG1, Kista

  2. 1. Overview • ISO/IEC JTC1 SC25 WG3: • Interconnection of information technology equipment, • Information & Communication Technology (ICT) Cabling Systems for Buildings, • Specified in ISO/IEC 11801 series standards and related documents. • Report covering 1/1/2013 to 6/30/2013 • SC25 WG3 develops cabling systems standards for: • enterprise, industrial and residential environments, • Local Area Networks (LAN), Intelligent Building networks, and Data Centers. ISO/IEC SC25 WG1, Kista

  3. 2. Primary objective • ISO/IEC 11801 3rdedition completed its preparatory stage to go forward in the committee stage. • Series of 5 standards • The series revision includes the original two part 11801 2nd edition • Generic cabling for all customer premises • Commercial buildings cabling systems - for the Enterprise. • The new 11801-X series includes three additional related standards, • Industrial, • Residential, • Datacenter cabling. ISO/IEC SC25 WG1, Kista

  4. 2. 11801-X series ISO/IEC SC25 WG1, Kista

  5. 3. Related projects, in development • ISO/IEC TR11801-99-1, Technical Report for the next generation Twisted-pair cabling, for supporting 40Gb/s applications • Entered the enquiry stage from the last meeting. • In support of the IEEE 802.3bq project for 40GBASE-T, next generation 40G Ethernet over-twisted-pair. • ISO/IEC 14763-3, 2nd edition revision, Standard for Testing 11801 Optical Fiber Cabling Channels • Entered the enquiry stage from the last meeting. • Test method improvements to support component and channel performance improvements for new optical fiber media classes added to ISO/IEC 11801 edition 2.2. (OM4) • Contains some duplications of IEC SC86C standards ISO/IEC SC25 WG1, Kista

  6. 4. Related projects, new • Automated Infrastructure Management (AIM) systems • Automated cabling administration systems: intelligent patch-panels, management program interface • Two open projects: • ISO/IEC 14763-2 Amendment 1, adds informative text covering AIM functional guidelines • Enquiry stage • First amendment of Standard for Implementation and Operation of customer premises cabling, Planning and Installation. • ISO/IEC 18598 new standard for AIM systems • Preparatory stage • Requirements of AIM elements supporting cabling systems within buildings. • ISO/IEC 30129 Telecommunications Bonding • Committee stage • Requirements of bonding-to-earth systems supporting cabling within buildings. • ISO/IEC TR17979-X-X series, specifications for Twinax cable assemblies • Preparatory stage • Transmission characteristics of cable assemblies • Support new IEEE 802.3 Ethernet direct-connection interface standards • Support interconnection cable specifications within SC25 WG4 standards, e.g. SATA. ISO/IEC SC25 WG1, Kista

  7. 5. Meetings • a. Previous Meeting: • 54th WG 3 interim 2013-02-25/03-01 Ixtapa, MX • b. Next Meetings: • 55th WG3 plenary 2013-09-30/10-03 Kista, SE • 24th SC25 plenary 2013-10-04 Kista, SE • 56th WG3 interim 2014-02-24/28 TBD, JP • 57th WG3 plenary 2014-09-15/18 TBD, TBD • 25th SC25 plenary 2014-09-19 TBD, TBD ISO/IEC SC25 WG1, Kista

More Related