Space Weather Product Team (SWPT) Kick Off Meeting March 26, 2014
Outline • Space Weather Product Team (SWPT) • SWPT Membership • Support Team Interactions • POSST SWPT Scope • PLT/PLTP Links • PLT/PLPT Test Forms (5 slides) • Schedule (Notional)
SWx Products Team • The Space Weather Product Team (SWPT) consists of relevant subject matter experts and GOES-R program engineers supporting the effective handover/management of the GOES-R series space weather sensors and validation of GOES-R SWx L1b products. The SWPT operates under the auspices of the CWG but reports directly to the POSST Operations Manager. • Principal Duties of the SWPT are to: • Develop procedures for Post-Launch Tests (PLTs) of the GOES-R sensors and Post-Launch Product Tests (PLPTs) for GOES-R L1b products. • Conduct analyses from assigned PLTs and PLPTs to verify nominal instrument performance and validate L1b products. • Report instances of L1b product non-compliance or anomalous behavior. • Advise Program on the efficacy of GS performance monitor tools at OSPO. • Provide needed information and support to Program and Project system integration, operations, transition and handover reviews.
SWPT Membership [TBD] Bob Iacovazzi, POSST Ops Manager • MIT/LL • Monica Coakley, Organizational Lead • Fred Rich, MAG, SEISS • New assignee, EXIS, SUVI • NGDC • Bill Denig, Team Lead • William Rowland, SWT SE • Juan Rodriguez, SEISS • Jon Darnel, SUVI • Janet Machol, EXIS/EUVS • Alysha Reinard, EXIS/XRS • Paul Loto’aniu, MAG • Rob Redmon, MAG • New hire, SEISS • CWG • Changyong Cao, CWG Chair • MOST • Stan Markelov • Alicia Moore • Matt Garhart • Melissa Frederick • Flight Project • Monica Todirita • Kumar Tadikonda • Dennis Chesters • Gus Comeyne, EXIS, SUVI • Dan Flanagan, SEISS • Ground Segment Project • Randy Race • Farida Adimi • DOST • Marge Ripley Vendor participation – TBD / Missing OSPO participation
Support Team Interactions GOES-R System Validation Success • Mission Operations Support Team (MOST) – Flight segment certification with support from Flight Systems Engineering, and mission operations validation [POC – Mission Operations Manager] • Data Operations Support Team (DOST) – Product generation, distribution, and monitoring operations validation [POC- Data Operations Manager] • Product Operations Science Support Team (POSST) – Calibration, image navigation and registration (INR), and product science validation [POC – POSST Operations Manager] Mission Operations Support Team Product Operations Science Support Team Data Operations Support Team Not to be confused with You Are Here
POSST SWPT Scope Timeline
PLT / PLPT Links (per Bob) GS Cal Capabilities Val Cal, INR, & Product Val Propose and evaluate Test plans Develop necessary test procedures. Propose and evaluate Inspection and Demonstration plans. Coordinate, schedule, and execute Test. Coordinate, schedule, and perform Inspection or Demonstration. Perform and required analysis and create Test report. Recommend Test Approval (Test Team Lead) Cal/Val Pre-Incident Report Anomaly Triage and Exploration (PIRATE) and GOES Incident Report (IR) Processes Create Inspection and Demonstration Report. Test Approval (MOM or Program Scientist) OSPO Recommend Inspection or Demonstration Approval (Test Team Lead) Instr. Vendor MOST DOST Inspection or Demonstration Approval (DOM) POSST (GS Cal Capabilities Val) POSST (Cal, INR & Product Val)
PLT / PLPT Forms SEISS (as submitted) MOST & DOST will assign PLTs and PLPTs
PLT/PLPT Forms SUVI
PLT/PLPT Forms EXIS (1 of 2)
PLT/PLPT Forms EXIS (2 of 2)
PLT/PLPT Forms MAG
Schedule (Notional) NOTIONAL ONLY