1 / 16

EN VOYAGE AIRWAYS

2004 Annual Results. EN VOYAGE AIRWAYS. Presentation to Board of Directors and respective shareholders. The Management Team An Introduction. - Fleet / Scheduling Officer – Maria Tavassali - Chief Financial Officer – Adam Purcell - Finance Manager – Ricky Young

norton
Download Presentation

EN VOYAGE AIRWAYS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2004 Annual Results EN VOYAGEAIRWAYS Presentation to Board of Directors and respective shareholders

  2. The Management TeamAn Introduction - Fleet / Scheduling Officer – Maria Tavassali - Chief Financial Officer – Adam Purcell - Finance Manager – Ricky Young - General Manager – Richard Chen - Human Resources Officer – Dickson Chan

  3. The En Voyage network - existing routes The 3 routes are based on figures of last year’s annual results. These 3 routes are then fixed, and used for adding new routes

  4. The En Voyage network - existing routes and new routes • Based on the 3 previously established routes, • we established the locations and city-pairs of • the 3 possible new routes.

  5. Analysis of current routesfinancial figures of modified frequencies • Initial routes are: Operated from our hub at MTP • MTP-HLT • MTP-DRF • MTP-SDT

  6. Brief Analysis of results of possible new routes • Using current aircraft ($ costs per hour) and other figures, predicted results for new routes will be:

  7. Overall results and what action to take? • Resulting profit per year of almost 100 million dollars • New routes (direct point-point services) may undercut traffic numbers on some existing routes • Routes which are not going ahead are: ?? • Sponsorship in beer festival in NWY to increase leisure traffic

  8. Aircraft Utilisation – Current, and new route figures Existing utilisation*: B737 utilised almost 9 hours per day B747 utilised almost 12 hours per day B767 utilised almost 10 hours per day * This takes into account of turnaround times Utilisation charts for 737, 767 and 747 • 737: utilised 6 hrs per day • 767: 2 aircrafts: aircraft A: 7hrs per day, aircraft B 6hours and 40 minutes • 747: utilised 11 hours per day

  9. Utilisation charts • 747 (MTP-HLT) Turn around time: 90 min This route is by far the most profitable and is using is being utilized well.

  10. Utilisation charts • 737 (MTP-SDT) & (MTP-NWY) Turn around time: 30 min Our route analysis showed that the highest profit comes from flying 3 sectors per day with the B737 as shown above.

  11. Utilisation charts • Interesting thing about the 767 operations: • We have 3 options • 767 (SDT-HLT) 3x per week / (DRF-SDT) 3x per week & (MTP-DRF) Option 1: transport the B767 between SDT and MTP in order to successfully implement the SDT-HLT route

  12. 767 (SDT-HLT) 3x per week / (DRF-SDT) 3x per week & (MTP-DRF) Option 2: Drop operations on the MTP-DRF routes from 14 down to 9 per week. This would also include transporting the aircraft between MTP and SDT one day of the week.

  13. 767 (SDT-HLT) 3x per week / (DRF-SDT) 3x per week & (MTP-DRF) turnaround time 45 mins Option 3: Lease a new B767 to operate the SDT-HLT route independently.

  14. Summary & Recommendations • Improvements can be made from our original services • Addition of some new routes (even if they undercut our other routes) can still enable healthy profit • Loss making routes are kept with the loss minimised to provide service and keep market share from competitor • Leasing an additional 767 to cover new route

  15. Bon Voyage!

  16. End of presentation • This powerpoint is last modified on: 8 / 9 / 2004 at 10:26 pm • An accompanying word document of the overall slides and number of clicks etc • http://www.users.on.net/~mnleung/avia1900groupproject.doc • If there are any updates to data which is required in this presentation, please notify me on chantakyin@hotmail.com or group email!

More Related