Roadmap to Achieve 31.12.2010 RBM Targets (Ethiopia)

Roadmap to Achieve 31.12.2010 RBM Targets (Ethiopia). September 2009 – December 2010. Country Summary. Population at risk: (68% of 79,835,354 = 54,288,040). LLIN resources available to achieve the 2010 targets. LLIN Ordering & Distribution to end 2010.

nova
Download Presentation

Roadmap to Achieve 31.12.2010 RBM Targets (Ethiopia)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Roadmap to Achieve 31.12.2010 RBM Targets (Ethiopia) September 2009 – December 2010

  2. Country Summary Population at risk: (68% of 79,835,354 = 54,288,040)

  3. LLIN resources available to achieve the 2010 targets

  4. LLIN Ordering & Distribution to end 2010

  5. ACT resources available to achieve the 2010 targets

  6. Case management

  7. IRS resources available to achieve the 2010 targets

  8. Indoor Residual Spraying

  9. Other core interventions to be delivered over the next 17 months • Malaria indicator survey 2010, Health facility survey 2009 • Drug efficacy study 2009 • Insecticide efficacy study 2009 • Revision of guidelines ( malaria diagnosis and treatment guide line, malaria epidemic prevention and control (2003), integrated (IRS+ITN) vector control, and malaria communication guideline). • Finalization of National Malaria prevention, Control and Elimination Strategy (2010- 2015) • Malaria risk Mapping • Community empowerment and social mobilization • Strengthen HEP through training, supportive supervision, etc

  10. Summary of rate-limiting factors (challenges) over the next 17 months External factors Delay in signing & disbursement of GFATM fund Financial gap to reach universal coverage Internal factors Low utilization of malaria interventions Logistic and supply management Monitoring and evaluation

  11. Summary of external technical assistance needs to end 2010

More Related