ECAL DCS : Plans for 2003 G. Dissertori ETHZ 27.11.2002 G. Dissertori ETHZ
ECAL Electronics, DCS Contents • Description of the prototype slow control system • comments regarding each subsystem G. Dissertori ETHZ
ECAL Electronics, DCS DIM , XDAQ/PVSS DB/ Archive DAQ Main DCS console (PVSS, JCOP Framework) DIM ? DIM ? HV (PVSS) LV (?) Temp/Humid.Monit. (PVSS) DSS (PVSS) Cooling (?) Laser (?) G. Dissertori ETHZ
ECAL Electronics, DCS Main DCS Console HV LV DSS Cooling TEMP. + HUMID. Monit. LASER DAQ ALARMS DB/ARCH G. Dissertori ETHZ
ECAL Electronics, DCS Planning: Software • had a meeting recently (HV, LV, TSS, F. Glege) • for mid-2003 (SM0) : first prototype of DCS software system in PVSS • should include HV, LV, Temp.Monit., TSS, Cooling?, Framework with FSM, Partitioning, communication with XDAQ and ECAL DAQ? • test of this prototype during 2003 • beg. 2004: production setup for the SM calibration at H4 • during 2004, probably all resources needed for calibration • beg. 2005: first tests of a setup for full ECAL (maybe start with reduced size) • may have to find a location to do such a test • from mid 2005 on : install equipment and start testing of the full system • beg. 2006 : full system ready G. Dissertori ETHZ
ECAL Electronics, DCS Planning: Manpower • up to end-2003 : subprojects software covered by responsible groups, framework covered, but I guess with substantial help/input needed (from Frank Glege, I guess) • end 2003 - 2004: have to shift manpower (1 person) to framework, probably from TSS and Temp. monitoring • in 2005 - 2006 : would like to get help for the test and integration of full system, also for the interfacing with the DAQ : 1 person (0.5 FTE ?) G. Dissertori ETHZ
ECAL Electronics, DCS Wishes/ Request / AOB • we urge all subitems of DCS to look into PVSS (or a possible interface such as DIM) as soon as possible • when working with PVSS, follow rules when defining data points • please communicate, such as alarm types etc G. Dissertori ETHZ
ECAL Electronics, DCS HV issues • they use CAEN PS. Supported by JCOP. • Rome group will develop the HV PVSS application • prototype should be ready for SM0 • they will have Labview as backup G. Dissertori ETHZ
ECAL Electronics, DCS LV issues • exact system not yet defined ( in terms of hardware ) • planned to use DCUs (CCUs) to control the LVRs • therefore: will use XDAQ • therefore : will need PVSS - XDAQ interface • hopefully a very first prototype ready for SM0 G. Dissertori ETHZ
ECAL Electronics, DCS DSS issues • a first prototype already used in 2002 (M0’) • the Belgrade group will build the application • should be ready for SM0 • need good communication with DAQ, in order to get information from sensors integrated in PCBs • needs communication with cooling • sensors: as close as possible to final solution (2 sensors per module) G. Dissertori ETHZ
ECAL Electronics, DCS Temp./Humid. Monit. issues • a first prototype already used in 2002 (M0’) • the Protvino group (together with ETHZ) will build the application • should be ready for SM0 • needs communication with cooling (feedback ?) • sensors : as close as possible to final solution : • 10 temp.sensors per supermodule (4 on grid, 4 on screen, 2 on IN/OUT pipes). • 1 humidity sensor per module G. Dissertori ETHZ
ECAL Electronics, DCS Cooling issues • need to start discussion now • I think at the moment they use Labview G. Dissertori ETHZ
ECAL Electronics, DCS Laser issues • Need to start discussion now • I assume they will have their own software (not PVSS) • but at least we need software communication with the Laser system in order to know hardware status G. Dissertori ETHZ
ECAL Electronics, DCS Communication with DAQ • first tests for communication ECAL PVSS - XDAQ first half of 2003 • so hopefully ready for SM0 • As long as “J.Fay/J. Bourotte DAQ” is the run controller, have to communicate : best solution: DIM • the DIM name server would run on the central DCS station • APIs exist for different platforms • in PVSS (JCOP framework) DIM is integrated (as API manager, built in via particular definition of data points) • DIM could also be a candidate for other communications (eg. with LASER) G. Dissertori ETHZ
ECAL Electronics, DCS Database/Archiving • Probably will use PVSS archiving tools • what other kinds of databases will be used by others? G. Dissertori ETHZ
ECAL Electronics, DCS FRAMEWORK issues • A. Lister (ETHZ) just started to work on it • hopefully first prototype ready for SM0 • with FSM, partitioning, alarm handling, XDAQ interface ... • Note : planned that Alison leaves for CDF end 2003 (for some time). See man power issues.... G. Dissertori ETHZ