An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECAL DCS : Plans for 2003 G. Dissertori ETHZ 27.11.2002 G. Dissertori ETHZ

  2. ECAL Electronics, DCS Contents • Description of the prototype slow control system • comments regarding each subsystem G. Dissertori ETHZ

  3. ECAL Electronics, DCS DIM , XDAQ/PVSS DB/ Archive DAQ Main DCS console (PVSS, JCOP Framework) DIM ? DIM ? HV (PVSS) LV (?) Temp/Humid.Monit. (PVSS) DSS (PVSS) Cooling (?) Laser (?) G. Dissertori ETHZ

  4. ECAL Electronics, DCS Main DCS Console HV LV DSS Cooling TEMP. + HUMID. Monit. LASER DAQ ALARMS DB/ARCH G. Dissertori ETHZ

  5. ECAL Electronics, DCS Planning: Software • had a meeting recently (HV, LV, TSS, F. Glege) • for mid-2003 (SM0) : first prototype of DCS software system in PVSS • should include HV, LV, Temp.Monit., TSS, Cooling?, Framework with FSM, Partitioning, communication with XDAQ and ECAL DAQ? • test of this prototype during 2003 • beg. 2004: production setup for the SM calibration at H4 • during 2004, probably all resources needed for calibration • beg. 2005: first tests of a setup for full ECAL (maybe start with reduced size) • may have to find a location to do such a test • from mid 2005 on : install equipment and start testing of the full system • beg. 2006 : full system ready G. Dissertori ETHZ

  6. ECAL Electronics, DCS Planning: Manpower • up to end-2003 : subprojects software covered by responsible groups, framework covered, but I guess with substantial help/input needed (from Frank Glege, I guess) • end 2003 - 2004: have to shift manpower (1 person) to framework, probably from TSS and Temp. monitoring • in 2005 - 2006 : would like to get help for the test and integration of full system, also for the interfacing with the DAQ : 1 person (0.5 FTE ?) G. Dissertori ETHZ

  7. ECAL Electronics, DCS Wishes/ Request / AOB • we urge all subitems of DCS to look into PVSS (or a possible interface such as DIM) as soon as possible • when working with PVSS, follow rules when defining data points • please communicate, such as alarm types etc G. Dissertori ETHZ

  8. ECAL Electronics, DCS HV issues • they use CAEN PS. Supported by JCOP. • Rome group will develop the HV PVSS application • prototype should be ready for SM0 • they will have Labview as backup G. Dissertori ETHZ

  9. ECAL Electronics, DCS LV issues • exact system not yet defined ( in terms of hardware ) • planned to use DCUs (CCUs) to control the LVRs • therefore: will use XDAQ • therefore : will need PVSS - XDAQ interface • hopefully a very first prototype ready for SM0 G. Dissertori ETHZ

  10. ECAL Electronics, DCS DSS issues • a first prototype already used in 2002 (M0’) • the Belgrade group will build the application • should be ready for SM0 • need good communication with DAQ, in order to get information from sensors integrated in PCBs • needs communication with cooling • sensors: as close as possible to final solution (2 sensors per module) G. Dissertori ETHZ

  11. ECAL Electronics, DCS Temp./Humid. Monit. issues • a first prototype already used in 2002 (M0’) • the Protvino group (together with ETHZ) will build the application • should be ready for SM0 • needs communication with cooling (feedback ?) • sensors : as close as possible to final solution : • 10 temp.sensors per supermodule (4 on grid, 4 on screen, 2 on IN/OUT pipes). • 1 humidity sensor per module G. Dissertori ETHZ

  12. ECAL Electronics, DCS Cooling issues • need to start discussion now • I think at the moment they use Labview G. Dissertori ETHZ

  13. ECAL Electronics, DCS Laser issues • Need to start discussion now • I assume they will have their own software (not PVSS) • but at least we need software communication with the Laser system in order to know hardware status G. Dissertori ETHZ

  14. ECAL Electronics, DCS Communication with DAQ • first tests for communication ECAL PVSS - XDAQ first half of 2003 • so hopefully ready for SM0 • As long as “J.Fay/J. Bourotte DAQ” is the run controller, have to communicate : best solution: DIM • the DIM name server would run on the central DCS station • APIs exist for different platforms • in PVSS (JCOP framework) DIM is integrated (as API manager, built in via particular definition of data points) • DIM could also be a candidate for other communications (eg. with LASER) G. Dissertori ETHZ

  15. ECAL Electronics, DCS Database/Archiving • Probably will use PVSS archiving tools • what other kinds of databases will be used by others? G. Dissertori ETHZ

  16. ECAL Electronics, DCS FRAMEWORK issues • A. Lister (ETHZ) just started to work on it • hopefully first prototype ready for SM0 • with FSM, partitioning, alarm handling, XDAQ interface ... • Note : planned that Alison leaves for CDF end 2003 (for some time). See man power issues.... G. Dissertori ETHZ