Update False Floor and Roof

Update False Floor and Roof. Dennis Haasler EN-MEF-EBE. GIF++ Bunker (updated). New chicane. 4.80m. S pace for racks. Modified chicane. False Floor: GIF Implementation. Design for a maximum weight of 8t Distributed to 4 feet ( 2 t each ) With a footprint of A=100x100mm per foot

nusa
Download Presentation

Update False Floor and Roof

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update False Floor and Roof Dennis Haasler EN-MEF-EBE

  2. GIF++ Bunker (updated) New chicane 4.80m Space for racks Modified chicane Dennis Haasler - EN-MEF-EBE

  3. False Floor: GIF Implementation • Design for a maximum weight of 8t • Distributed to 4 feet (2t each) • With a footprint of A=100x100mm per foot • Distance between two feet equal or greater than 1m Use of the support structure from the standard CERN false floor - But cover plates made of steel, with t=20mm t=20mm 200mm 1000mm Cable Tray HEA100 400mm 300mm Dennis Haasler - EN-MEF-EBE

  4. Cable Trays at the Wall/Trigger 200mm U-beam 400mm Dennis Haasler - EN-MEF-EBE

  5. False Floor: Top View Cable Trays Source Ground - Trigger Dennis Haasler - EN-MEF-EBE

  6. False Floor: Cost Estimation • - Costs of the structure: 4€/kg (includes material and installation) • Steel plate (2m^2): 320€ • Cover cable tray(0.2x0.5m): 35€ In total: 41,000 € Dennis Haasler - EN-MEF-EBE

  7. Roof 1: T-Shaped Blocks (Concrete) Dennis Haasler - EN-MEF-EBE

  8. Roof 2: Plates + Beams 0.8m 2m 4m 5m Steel Beams 200x200mm Concrete Beams 4884 Concrete Plates t=400mm Dennis Haasler - EN-MEF-EBE

  9. Roof 2: Plates + Beams Dennis Haasler - EN-MEF-EBE