150 likes | 311 Views
ECB 6 Jun. 2014. Agenda. IBM & TSMC contracts Production of the GBT chipset and of the versatile link devices ECFA workshop on HL- LHC A.O.B Tour de table. IBM & TSMC Contracts. IBM Contract. In February IBM announced their wish to sell the foundries Visit of IBM 2 weeks ago
E N D
Agenda • IBM & TSMC contracts • Production of the GBT chipset and of the versatile link devices • ECFA workshop on HL-LHC • A.O.B • Tour de table
IBM Contract • In February IBM announced their wish to sell the foundries • Visit of IBM 2 weeks ago • Nigel Stoneman, Bleumicro Ltd. UK -> his company handles the CERN account and all POs are handled by him • Rich Busch Director, EMEA Semiconductor Sales, Stockholm • Gordon Farley, EMEA Semiconductor Sales,CH office • DavideTesta, CH office -> he prepares the IBM-CERN contract and handles all amendments • Explained the announcement of the sale was a rumour... • They lost profit in µelectronics but it was expected due to changes in video games • Then they said they would like the contract we have with them bemoved to MOSIS • No direct link with IBM anymore • We clearly said that from our side long term availability (up to 2020 at least) is a must • Change of contract on going (FC of September)
TSMC Contract • After years of discussion, an agreement on the NDA to be signed by CERN and participating institutes was reached • Printed version of the contract signed by CERN, then sent to IMEC and signed by IMEC • May 6 • Since then with TSMC and no news... • Design kit for the 130 nm: on going • Radiation testing of the 130 nm: test chip submission this summer
GBT Chipset & Versatile Link Production • Estimated quantity today probably incomplete • GBTx 41000, GBT-SCA 10000, GBLD 41000, GBTIA 15000 • VTTX 18000, VTRX 12000 • Procurement process difficult if several budget codes to be used • PH kindly agreed that we order on a PH account which should come back to zero after a while
GBT Chipset • Submission of an engineering run with the 4 ASICs beginning of July • Expected to be back in November • MS and IT for crystals and packaging • MS in July, IT in September, Order in October/November • Final validation of the designs January/February • “Reasonable” quantity available for the users • Large order to follow • ~140 wafers • Large quantity available during the fall of 2015
Versatile Link Components • Procurement process of the optical components has started • Note that the GBLD and the GBTIA are needed to get the VTXX • The GBTIA has to be included in the ROSA a bit more delay • Main cost drivers are the TOSA and the ROSA
Price List • Chips and VTXX will be sold to the experiments at the following price: • GBTX 50 CHF • GBT-SCA 24 CHF • VTTX 150 CHF • VTRX 200 CHF • Pledge letters from the experiments requested when we place big orders
What is required from the Elec. Coord.? • Take note of the price list and use it • Check it’s properly budgeted in the projects • Refine quantities • We shall order additional devices to take into account yield and the unforeseen needs but the more we know, the better it is • Check that getting pledge letters is OK from your experiment
Electronics PG • Summary of the first SG meeting (from Magnus) • The group should organize Electronics Systems, ASICs, High Bandwidth links, High Density Inter-connects, Power systems, Modular electronics, and xTCA. • The group should include requirements and talks from all systems, thus no or very little overlap with subsystem/detector class sessions that will NOT include electronics. We have 3 full hours. Lots of work. • We need to prepare a group mailing list and organize meetings as required. • Typically: Magnus, Philippe, Ken and Alex. • This time we are suggested to be more inclusive, thus add any number of participants to the preparatory group. • Tentative schedule: • End June: preparatory group definition • End July: Talks definition • September: Agenda with agreed speakers