An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lawrence Street CenterCase Study Craig Griffiths Merrill Lynch

  2. Lawrence Street Center • Steel & concrete structure • Concrete & glass wall construction • 14 floors, 140,000 sq.feet • Commercial offices & radio stations • 6 am to 6 pm operation

  3. Inefficient cooling system oversized chiller running at low part load efficiencies 15 year old electric chiller, CFC refrigerant R-11 Public Service Company utility rebate program currenlty in effect Lawrence Street Center Project Scenario

  4. Lawrence Street Center Internal Loads • Lighting with standard fluorescent fixtures • Office equipment - PC’s, copiers, fax machines • Telecommunications equipment for four radio stations

  5. Lawrence Street Center Project Challenges • Space constraints on chiller make replacement very difficult • Quick turnaround time necessary • only 3 weeks for retrofit work before spring startup

  6. Lawrence Street Center Original Chiller • 400 ton Carrier electric chiller • R-11 refrigerant • 0.72 kW/ton full-load efficiency • Only operating at 60% capacity • In third floor mechanical room

  7. Lawrence Street Center Chiller Driveline Retrofit • Replaces the driveline, including starter, motor, compressor, purge unit and controls • New parts compatible with new refrigerant • HCFC-123 used in Lawrence Street Center • Kept old heat exchanger • checked the shells & tubes condition with eddy current testing of the condenser and evaporator • Retrofit work by York International

  8. Lawrence Street Center Other Chiller Enhancements • External oil pump installed • allows chiller operation at a lower condenser water temperature • more energy savings when ambient conditions permit • New chiller control panel • Refrigerant monitoring system and high-efficiency purge unit

  9. Lawrence Street Center Retrofitted Chiller • Capacity reduced from 400 tons to 290 tons • Full load electricity use down to 0.59kW/ton from 0.72 kW/ton • Payback period of 7.5 years without rebate

  10. Lawrence Street Center Project Timeline • Chiller retrofit work generally takes 1-2 months, this was a rush job, done in 3 weeks

  11. Lawrence Street Center Energy Savings Results • Occupancy increased significantly during and just after the retrofit occurred • from ~ 75% occupancy to ~ 95% • Utility bills stayed about the same as during the last cooling season • Chiller downsizing and efficiency gains offset the occupancy increase

  12. Lawrence Street Center Project Results • Significant energy savings from more efficient, correctly sized chiller • Switch to HCFC refrigerant • no longer have to deal with escalating R-11 prices • Fairly short payback period, thanks to utility rebate

  13. Lawrence Street Center Extension of Project Results • Most chillers are incorrectly sized • measure energy use carefully to see how much downsizing and/or staging of chillers can save • Load reductions and system improvements could have been done with chiller work • save even more energy and $$$ • potential to downsize chiller even further • help finance chiller and reduce payback period • correct any building problems