Alstom Wind

Alstom Wind. Félix Urrea, VP Operations EMEA. Madrid, 20 th May 2010. Agenda. Topic 1 Our Group: A major industry player . Topic 2 Introduction to Alstom Wind . Topic 3 Technology . Topic 4 Product Platforms: ECO 80 & ECO 100 . Alstom Group Two activities. N°1 worldwide .

nyx
Download Presentation

Alstom Wind

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alstom Wind Félix Urrea, VP Operations EMEA Madrid, 20th May 2010

  2. Agenda Topic 1 Our Group: A major industry player Topic 2 Introduction to Alstom Wind Topic 3 Technology Topic 4 Product Platforms: ECO 80 & ECO 100

  3. Alstom GroupTwo activities N°1 worldwide N°2 worldwide N°1 worldwide in integrated power plants hydro power* air qualitycontrol systems services for electricity utilities in high speed and very high speed in urban transport(metros and trams) * through Alstom Hydro, a 50/50 joint venture between Alstom and Bouygues set up in 2006 • N°2 worldwide in Rail transport infrastructure • N°3 worldwide in Power generation infrastructure

  4. Alstom Group81,700 employees in over 70 countries 60%in Europe 45,600 employees 16%in North America 12,160 employees 17%in Asia & Pacific 12,920 employees 1% in Middle East & Africa 760 employees 6%in Latin America 4,560 employees Source: Alstom 2008/09

  5. Alstom GroupPower Sector • Alstom Power offers • Coal-fired and Gas-Fired Power Plants • Hydro Power Plants and Wind Power Solutions • Nuclear Power Plants (Conventional Island) • Power Plant Management (service packages,maintenance&service agreement) • Retrofit solutions & services for the installed base

  6. Our solutions:Technologies adapted to all energy sources Gas Coal Oil Hydro Nuclear (Conv. Island) Wind

  7. Our extensive offering:A strong competitive advantage Heat Recovery Steam Generator Nuclear/Conv. Island Environ-mental control systems Renewable Large Gas Turbine Energy mgmt Large Steam Turbine Gene- rators Heat Exchanger Plant Boilers Wind Hydro (*) Competitor 2 Competitor 1 Competitor 3 SYSTEMS PRODUCTS SERVICES Strong presence Medium presence None

  8. Agenda Topic 1 Our Group: A major industry player Topic 2 Introduction to Alstom Wind Topic 3 Technology Topic 4 Product Platforms: ECO 80 & ECO 100

  9. Introduction to Alstom WindInternational Footprint Toulouse • Ecotècnia: established in 1981 • More than 2,100 MW and 1,800 wind turbines in 100 Wind Farms • Spain • Portugal • France • Italy • Japan • UK • Global headquarters in Barcelona • >1 000 employees • Working for further expansion in Europe, America and Asia Amarillo* Assembly WTG Beijing Operations Asia Richmond Operations North America Barcelona R&D Bahia* Assembly WTG Barcelona Headquarter & Operations EMEA São Paulo Operations Latin America Buñuel Assembly WTG Coreses Tower Manufacturing Rio del Pozo O&M workshop Somozas ComponentAssembly OFFICES FACTORIES R&D * Assembly unit to be in operation in 2011

  10. Introduction to Alstom WindEvolution figures From 765 employees in 2007 to more than 1,000 employees in 2010 Our R&D activities: from 60 dedicated engineers in 2007 to 150 engineers in 2010 Headquarters in Barcelona host 380 employees, over 78% engineers and other university graduates April 2010: Alstom wins its first contract in the Moroccan wind power market with a wind farm totalling 100 MW

  11. Land localization • Wind measurement • Land lease agreement • Complete permitting • Turbine design • Component and material sourcing • Manufacturing and assembly • Transport • Erection and commissioning • Preventive & Corrective maintenance • Parts delivery • Upgrade packs • Civil Work • Electrical cabling Wind farm construction Operation & Maintenance Wind turbine supply Wind farm development Introduction to Alstom WindAreas of expertise Expertise across the entire value chain

  12. Agenda Topic 1 Our Group: A major industry player Topic 2 Introduction to Alstom Wind Topic 3 Technology Topic 4 Product Platforms: ECO 80 & ECO 100

  13. TechnologyProven technology • Over 1 800 wind turbines of different generations are in operation • Concepts are coming from a track record in challenging sites • A safe design is ensured by measurements and validated simulations • Components fully tested Pitch- VS Modular ALSTOM PURE TORQUE™ Yaw concept Built on the experience of previous WT generations

  14. Agenda Topic 1 Our Group: A major industry player Topic 2 Introduction to Alstom Wind Topic 3 Technology Topic 4 Product Platforms: ECO 80 & ECO 100

  15. ECO 100 platform: higher energy yield • Power: 3MW • Rotor Ø: 100, 110m • Status: ECO 100: series ECO 110: proto 2009 ECO 80 platform: for complex terrains • Power: 1.67MW • Rotor Ø: 80, 86m • Status: ECO 74/80: >1 300MW ECO 86: proto 2010 Wind farm construction Operation & Maintenance Wind turbine supply Wind farm development Product platformsOnshore Wind - Broad product portfolio Output MW ECO 110 3MW ECO 100 3MW 3 ECO 80 2MW 2 ECO 86 1.67 ECO 80 1.67 1.67 1 Site Wind Speed Low Medium High Optimizing yield with different site conditions

  16. 3 4 2 1 7 8 5 6 ECO 100 platform Overall Performance & Environmental Benefits Electricity for 2000 Households = 3MW 7000 Tn CO2 Saving/year

  17. Thank you for your attention