1 / 35

COLEGIO CRISTIANO AVIVANDO EL FUEGO

COLEGIO CRISTIANO AVIVANDO EL FUEGO. EMI PROJECT NO. 10-7069 PROPOSAL. SURVEYING. JAMES HIBBS ZACHARY HIBBS ELLIOT SMITH. SITE VISIT. EXISTING SITE CONDITIONS. WATER/WASTEWATER. RALPH KINDER TOM KRUEGER. WATER SUPPLY OPTIONS. DUG WELL AT SPRING DUG WELL AT SITE (OPTION SELECTED)

nyx
Download Presentation

COLEGIO CRISTIANO AVIVANDO EL FUEGO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COLEGIO CRISTIANOAVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

  2. SURVEYING JAMES HIBBS ZACHARY HIBBS ELLIOT SMITH

  3. SITE VISIT

  4. EXISTING SITE CONDITIONS

  5. WATER/WASTEWATER RALPH KINDER TOM KRUEGER

  6. WATER SUPPLY OPTIONS • DUG WELL AT SPRING • DUG WELL AT SITE (OPTION SELECTED) • CONNECT TO CITY WATER SUPPLY

  7. Dug wells • CONSTRUCTION FEATURES • CASED WITH WATERTIGHT MATERIAL • WELL COVERED BY CONCRETE CURB AND CAP • MOUNDED LAND SURFACE AROUND WELL TO AVOID PONDING • IDEALLY, PUMP FOR WELL SHOULD BE IN YOUR BUILDING OR IN A SEPARATE PUMP HOUSE

  8. WASTEWATER TREATMENT OPTIONS • SEPTIC SYSTEM • LAGOON SYSTEM • CONNECT TO CITY SEWER

  9. Basis of design leach field

  10. Basis of design120 Day TREATMENT LAGOON

  11. WATER QUALITY TEST RESULTS *BACTERIA TEST IS FOR HYDROGEN SULFATE PRODUCING BACTERIA. HYDROGEN SULFATE PRODUCING BACTERIA ARE POTENTIALLY DISEASE CAUSING

  12. WATER CAPACITY TESTS

  13. CURRENT USE • TOTAL 24 HR USE: • 17 M3 (4,500 GPD) • 41.3 GAL/STUDENT • (109 STUDENTS) • 3.1 GPM • PEAK DAY: • 9,000 GPD • 6 GPM • 8 HR PEAK USE: • 19 GPM • 4 HOUR PEAK USE: • 37.5 GPM

  14. WATER SYSTEM PLANNING FACTORS • TOTAL STUDENTS: 350 • SCHOOL USAGE : 10 TO 15 GPM • HOUSES: 2 • HOUSE USAGE: 267 GPD • WELL DEPTH = 110 M • HOSE BIB USE (SCHOOL): • 2 BIBS X 2 HRS X 5 GPM = 1200 GPD • HOSE BIB USE (HOUSES): • 1 BIB X 2 HOUSES X 5GPM = 1200 GPD

  15. WATER SYSTEM REQUIREMENTS

  16. PUMP RECOMMENDATION • RECOMMENDED PUMP: • POWER: 7.5 HP • FLOW RANGE: 20 TO 80 GPM • GOULD MODEL 55GS75CBM OR EQUIVALENT HEAD COMPUTATION • TOTAL LIFT IN WELL: 110 M/361 FT • PUMPING LIFT: 3.2 M/10.5 FT • STATIC DISCHARGE PRESSURE: 40 PSI/17.3 FT • FRICTION LOSSES: 5%/19.5 FT • TOTAL REQUIRED HEAD: 408 FT

  17. WATER STORAGE REQUIREMENTS

  18. WASTEWATER • PERC TEST RESULTS: 7.5 TO 25 MIN/INCH • SYSTEM REQUIREMENTS: 1.2 TO 1.5 LF/GPD • LATERAL FIELD REQUIRED: • LENGTH: 13,745 LF/4,229 M • AREA: 151,195 SF/14,046 M2 • AREA AVAILABLE: • OUTSIDE WALL: 734 M2 • INSIDE WALL: 604 M2 • TOTAL: 1,338 M2

  19. WATER/WASTEWATER SUMMARY • AREA AVAILABLE IS NOT LARGE ENOUGH TO ACCOMMODATE REQUIRED LEACH FIELD • RECOMMEND CONNECTING WASTEWATER DISCHARGE TO EXISTING MUNICIPAL COLLECTION LINE • IF WELL WILL PRODUCE AT LEAST 41 GPM, INSTALL A PRESSURIZED WATER SYSTEM USING A 7.5 HP PUMP. • IF WELL PRODUCES LESS THAN 41 GPM, INSTALL AN OPEN SYSTEM WITH A STORAGE TANK.

  20. STRUCTURAL RICHAL SMITH AMOS MELLBOM

  21. PROPOSED FLOOR SYSTEM

  22. ALTERNATE FLOOR SYSTEM

  23. ARCHITECTURAL JAY HOSKINSON DAN WALL MICHAEL BADEN

  24. SITE PLAN BELOW GROUND TANKS PLAY EQUIPMENT ABOVE GROUND TANKS HOUSE PLAY FIELD COURTYARD HOUSE WELL GATE PLAY FIELD N

  25. MAIN FLOOR PLAN

  26. UPPER FLOOR PLAN

  27. SECTIONS

  28. EAST & WEST ELEVATIONS

  29. SOUTH ELEVATION

More Related