1 / 13

WHAT’S THE POINT…

WHAT’S THE POINT…. why use modular systems? schedule sensitive cost effective flexible and scalable sustainable environmentally responsible. the most expensive construction item is time…. SIMPLE. … modular solutions are installed in less time. THE DECISION….

oakley
Download Presentation

WHAT’S THE POINT…

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WHAT’S THE POINT… why use modular systems? schedule sensitive cost effective flexible and scalable sustainable environmentally responsible

  2. the most expensive construction item is time… SIMPLE … modular solutions are installed in less time

  3. THE DECISION… reduce design time/cost reduce construction time/cost reduce time spent on changes reduce material waste reduce occupancy costs build-in flexibility build-in scalability build-in protection

  4. labor materials labor materials DOLLARS & SENSE typical budget for electrical is $12 - $13 / sq.ft. final ‘branch’ distribution is conservatively 30% of budget $3.60 / sq.ft. for final branch a typical modular solution is approx. $2.35 / sq.ft. install cost is approx. $0.60 - $0.65 / sq.ft. total cost $3.00 / sq.ft. install is at least twice as quick as ‘pipe & wire’ cost effective – schedule sensitive

  5. ICE LAYOUTS the power of ICE real-time, interactive 3D software working with owners, engineers, and contractors develop project specific solutions multiple levels of flexibility spider + ICE = agility

  6. AGILE FLOORS zone distribution box extender cable splitter access floor boxes

  7. AGILE CEILINGS • ceiling distribution box • extender cable • splitter • modular wall boxes

  8. AGILE WALLS splitter single-sided back-to-back multi-circuit vertical to the ceiling

  9. AGILE WALLS existing distribution… ? replace the ceiling distribution box with a whip/JB economical solution to convert existing building power from ‘hard-wire’ to modular wiring available with or without junction box

  10. AGILE FURNITURE provide power and data at desktop retrofit into office, hospitality and educational environments available pre-wired with power cord or empty for on-site wiring Phantom Open Phantom Closed Marquee Shadow Concord Mirage

  11. SPIDER SOLUTIONS not just modular products, solutions for agility cost effective and schedule sensitive the power of ICE modular wiring systems electrical boxes for construction

More Related