1 / 18

New Hangar and Storage Shed Design at Burlington International Airport

New Hangar and Storage Shed Design at Burlington International Airport. Senior Capstone Design Project Civil and Environmental Engineering University of Vermont. Erin Flynn and Phillip Peterson Presenting.

Download Presentation

New Hangar and Storage Shed Design at Burlington International Airport

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Hangar and Storage Shed Design at Burlington International Airport Senior Capstone Design Project Civil and Environmental Engineering University of Vermont Erin Flynn and Phillip Peterson Presenting

  2. Working with Heather Kendrew and Robert McEwing at the Burlington Airport as part of service-learning project. Overview

  3. Teams Team 1: Site preparation, demolition/deconstruction of existing buildings Team 2: Equipment and chemical storage facility layout and design Team 3: New Hangar layout and design

  4. Site Overview

  5. Team 1: SITE PREPARATION Pavement Removal Slab Removal Silt Fences and Erosion Control

  6. Demolition -Existing Conditions -Salvage and Recycling of Building Materials -Demolition Procedure -Demolition Costs -Demolition Permits

  7. Team 2:Storage Facility Existing Building 870

  8. Site Plan & Building Layout Existing structures and utilities, overlay (shaded area) of the proposed storage facility

  9. Interior layout of proposed storage facility

  10. Radiant Floor Heating System

  11. Team 3 Hangar Design Existing hangar – 40,000 sqft

  12. New Hangar 70,000 sqft

  13. Structural Design

  14. Structural Design

  15. Sliding Hangar Door • No part of the door weight is supported by the building frame • Door is carried by ASCE certified Crane Rails • Door is guided by top rollers that travel on overhead guides • Can be customized to almost any size

  16. Building Layout • Oil-water separator • Drainage

  17. Water Main

  18. Summary • Storage Shed and New Hangar Design • Storage Shed Pre-Fab • Hangar Original Design

More Related