New Hangar and Storage Shed Design at Burlington International Airport. Senior Capstone Design Project Civil and Environmental Engineering University of Vermont. Erin Flynn and Phillip Peterson Presenting.
E N D
New Hangar and Storage Shed Design at Burlington International Airport Senior Capstone Design Project Civil and Environmental Engineering University of Vermont Erin Flynn and Phillip Peterson Presenting
Working with Heather Kendrew and Robert McEwing at the Burlington Airport as part of service-learning project. Overview
Teams Team 1: Site preparation, demolition/deconstruction of existing buildings Team 2: Equipment and chemical storage facility layout and design Team 3: New Hangar layout and design
Team 1: SITE PREPARATION Pavement Removal Slab Removal Silt Fences and Erosion Control
Demolition -Existing Conditions -Salvage and Recycling of Building Materials -Demolition Procedure -Demolition Costs -Demolition Permits
Team 2:Storage Facility Existing Building 870
Site Plan & Building Layout Existing structures and utilities, overlay (shaded area) of the proposed storage facility
Team 3 Hangar Design Existing hangar – 40,000 sqft
New Hangar 70,000 sqft
Sliding Hangar Door • No part of the door weight is supported by the building frame • Door is carried by ASCE certified Crane Rails • Door is guided by top rollers that travel on overhead guides • Can be customized to almost any size
Building Layout • Oil-water separator • Drainage
Summary • Storage Shed and New Hangar Design • Storage Shed Pre-Fab • Hangar Original Design