200 likes | 347 Views
Bratislava 4.10.2007. One of the largest construction companies in Norway Ca 1800 Employees Turnover 2006 NOK 5.194 mill. = 675 mill. Euro Result at NOK 185,0 mill= 24 mill. Euro Order book 700 mill. Euro. AF Gruppen ASA. Organization plan. Vision. Businessidea.
E N D
Bratislava 4.10.2007
One of the largest construction companies in Norway Ca 1800 Employees Turnover 2006 NOK 5.194 mill. = 675 mill. Euro Result at NOK 185,0 mill= 24 mill. Euro Order book 700 mill. Euro AF Gruppen ASA
Vision Businessidea We will use energy on saving energy. We shall be Norways leading expertise and parner within right use of energy. Vision og businessidea, AF Energi & Miljøteknikk.
AF Energi & Miljøteknikk We offer 4 different qualifications too the market; • Analyse and design of systemes for efficient energy use • We work out projects and enterprises - with guarantee of investment and result • Servicing, maintenance and modification – too keep the energycost low after enterprises
We have designed an energycentral in Oslo based on heatpumps with Europs larges storage of thermal energy in rock ground. We design a loth of centrals based on biomass energy and wood pulp In smaller areas it is normal to distribute both heating and cooling, with heatpumps that transform the energy We also offer: design, development and managenent of energycentrals and district heating based on renewable energy
Enterprise • Example: • Automations • Heat recovery • Heatpumps • Energy monitoring Energy saving procects Investment-calculations Need Energy analyse Energycost Maintenance cost Payback-period Energycost • Economy cut • Recommended effords • Energy monitoring Time Investment Goverment aid Maintenance Financial risk • Indoore climate • Electro • Heating • Ventilation • Automations • Document of guarantee Technical optimazing Economic optimizing Risk Physical effords Goverment aid
Energy efficient process with guarantee Energycost Chart of energy / benchmark • Energyconsumtion/Cost Optimizing/ Education • Technical defects • Technics out of function • Optimizing • Mapping possibel efforts • Reduction of energycost • 5 – 15 % Enterprise • Efforts on technical equipment • Heatrecovery • Heatpumps • Automatization Correct type of energy • Reduction of energycost 10 – 40 % Control Continual control of energycost Time
Server Energy monitoring – Tecnikal draft Energy Manager Application Software GSM Telco Ethernet Excel WEB report PowerGate kWh noder