1 / 12

SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires

SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires Seismic Interferometer to Measure Oscillations in the Interior of Stars.

odele
Download Presentation

SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIAMOIS Sismomètre Interférentiel A Mesurer les Oscillations des Intérieurs Stellaires Seismic Interferometer to Measure Oscillations in the Interior of Stars Benoît Mosser, Michel Auvergne, Thierry Appourchaux, Annie Baglin, Caroline Barban, Claude Catala, Marc-Antoine Dupret, MarieJo Goupil, Jean-Pierre Maillard, Eric Michel, Reza Samadi, Francois-Xavier Schmider, Frédéric Thévenin, Gérard Vauclair, Denis Fappani et al. Observatoire de Paris/LESIA, IAS, UNSA/LUAN, OMP/LATT, IAP, OCA, SESO kickoff meeting / introduction

  2. Summary • ‘History’ of the project • Current status • A few questions for the meeting Why this meeting ? kickoff meeting / introduction

  3. Past observations • 19901998: asteroseismology with the FTS at CFHT: • observations of Jupiter: large separation, rotation, amplitudes • 1998: tentative identification of the large separation of Procyon • (Mosser et al 1998, confirmed by Martic et al 1999) • Necessary evolution of the concept: • FTS (for ‘classical’ spectrometry)  Fourier tachometer (as GONG !) Talk: Jean-Pierre Maillard Doppler seismology with a Michelson interferometer kickoff meeting / introduction

  4. Evolution of the project • Need of a dedicated instrument: simple, robust, efficient • 2000: « ACI jeune chercheur »  SIAMOIS project: • Instrument principle • Performances (Mosser, Maillard and Bouchy 2003, PASP) • Preliminary design: no moving parts • Network observations • 2004: growing interest for observations at Dome C in Antarctica • Network  single site observations at Dome C • 2005: positive recommendation for asteroseismology at Dome C (PNPS) Claude Catala: Performances FX Schmider: Dome C 1) dedicated asteroseismometer with a small size telescope first wintering in 2010 2) 2-m class telescope + spectropolarimeter kickoff meeting / introduction

  5. Observations in Antarctica ? • Specifications for observations at Dome C • integrated project • dedicated small size telescope • project has to be fully automatic, ~ spatial condition • scientific programme • unfeasible elsewhere • ambitious • to make sense after COROT Jean-Tristan Buey, organization of the project Thierry Appourchaux spectrometry / photometry kickoff meeting / introduction

  6. Institutional partners at Dome C • IPEV (Institut Paul-Emile Victor) • - in charge of the Concordia base; wintering since 2005 • - supervises scientific projects • INSU (National Institute for Astronomy)/ Antarctic group • - promotes observations at Dome C • - has to identify pioneering projects in astronomy • PNPS (National programme for stellar physics) • - promotes the rapid development of an asteroseismometer at Dome C • ANR (Agence Nationale de la Recherche) : • - funding kickoff meeting / introduction

  7. Current status • Phase A in progress for the instrument • many subsystems ~ off-the-shelf • Management ~space project • Scientific committee • Steering committee • People involved (4 lab.+1 PME) • Chercheurs 13.8 hommes.ans • Doctorant(s) 6.0 hommes.ans • Ingénieurs 17.9 hommes.ans • CDD 2.3 hommes.ans • Schedule: first wintering in 2010 • Waiting on ANR funding • total budget = 860 kE in 4 years, 460 from ANR • results: June Project LESIA Telescope LUAN Bonnette LATT Instrument LESIA+IAS Interferometer SESO kickoff meeting / introduction

  8. Dome C : the only ground-based site providing a duty-cycle better than 90% Project : key science, for the future of asteroseismology after Scientific programme: a first class programme for many winterings, with a small collector Schedule : a rapid development for a pioneering project preparing the development of further astronomical programmes at Dome C Fourier tachometer: suitable concept for installation and setup at Dome C Highlights ‘‘Big science’’  at Dome C with a budget < 1 ME kickoff meeting / introduction

  9. Antarctica / network SONG project (funded for phase A): 7 sites, Iodine cell spectrometer + 60 cm telescope Presentation of SONG (Song meeting, march 06) Information on GONG (Frank Hill communication at SONG meeting) - 600 k$/yr for maintenance [~ 10% of initial budget] - 7 FTE (global reduction, archiving, processing, developement) - 60 Tbytes disk space kickoff meeting / introduction

  10. Questions for this meeting • Scientific programme • Which science with SIAMOIS ? • Performances, possible targets • Solar-like oscillations, asteroseismology • Preparatory work • Complementary program • Scientific  technical specifications • Requirements for the project • … Monday afternoon talks • Project and technics • Organisation • Interactions • Next steps • … Tuesday morning discussion kickoff meeting / introduction

  11. kickoff meeting / introduction

  12. Planning et budget du projet • 2006 : fin de phase A + phase B • 15 & 16 mai : atelier de travail • analyse thermo-mécanique • test du concept optique • rédaction du cahier des charges des différents sous-systèmes • design préliminaire • financement ANR ? (juin 2006) • 2007 • printemps : PDR • automne : FDR • analyses détaillées et lancement des contrats • 2008-2009 • validation, tests, intégration • tests sur le ciel • transfert au Dôme C • 2010 : 1er hivernage au Dôme C Interféromètre SIAMOIS JP Amans, GEPI, Obs Paris Coût complet : 860 kE Dont ANR : 460 kE Déjà acquis 2006 (ACI + CSA + PNPS) : 116 kE Un projet sol à mener dans un labo spatial kickoff meeting / introduction