UAF 2012 STEEL BRIDGE TEAM AMANDA GREEN TRIPP COLLIER WILL RILEY TAE FREEMAN JASON REIN STEVE LEE WAYNE PENCE TY WARDELL ADVISOR: Dr. J. LEROY HULSEY ADVISOR: WILHELM MUENCH
DESIGN • MAIN REQUIREMENTS: • Each member has to fit inside a 6”x4”x36” box • Overall height, length and width of bridge • Construction rules and restrictions • WHAT WE FOCUSED ON: • Decrease weight • Increase stiffness • Quick construction speed
BRIDGE Multiple designs drawn and tested in SAP (Structural Analysis Program)
CONNECTIONS • 3 Types of Connections for Main Span • Dove tail • T-slot • Twist lock • Specialized cantilever connections We wanted to utilize a side rotation for each main span member for quick construction.
FABRICATION • Steps: • Main-span members • rough cut • Mill • Top and bottom chord had plate welded • Connections • Welded entire main-span with connections in place • Cantilever
2012 PACIFIC NORTHWEST REGIONAL COMPETITION • April 27th-29th • Hosted By: • University of Washington & Seattle University • 13 Universities competing
2012 PACIFIC NORTHWEST REGIONAL COMPETITION DID AWESOME WE
ONWARD BOUND TO NATIONALS WATCH OUT CLEMSON HERE WE COME!! • May 25th-26th • Hosted By: • Clemson University in South Carolina • 47 Universities competing
Two National Titles – 1993, 1996 (tied) • 8 top 8 finishes at National Competition out of 12 attempts. • One provisional patent • Revolutionized method of testing students’ bridges at competition
History • 1993 – 1st time we competed; won all categories at Regional’s & all categories at National’s • 1995 – National’s: 4th place overall • 1996 - Disqualified at Regional’s; re-instated & tied for 1st at National’s. • 1997 - Did not send a bridge; bridge failed during testing. • 1998 – At Regional’s: Bridge collapsed during unloading; obtained a provisional patent for the concept. • 2001 – Bridge was not in top three at Regional’s. • 2002 - Bridge was not in top three at Regional’s. • 2003 - 6th at National’s • 2004 - 4th at National’s
HISTORY (CONTINUED) • 2005 - Regional’s • Overall Performance (1st) • Economy (1st) • Efficiency (1st) • Stiffness (2nd) • Lightness (2nd) • Construction speed (3rd) • Aesthetics (10th) National’s - 6th overall • 2006 – No bridge • 2007 - Hosted Regional’s • 2008 - 8th at Nationals
HISTORY (CONTINUED) • 2010 – Regional Competition. • Construction speed – (3) • Lightness - (1) • Display - (2) • Stiffness - (8) • Economy - (5) • Efficiency - (8) • Overall - (7)
History (Continued) • 2011- Regional’s took 1st place in five of the six individual categories. They were: efficiency, stiffness, economy, lightness and construction speed.The team also won fourth place in aesthetics. The record at National’s was : first place in Lightness and placed 8th overall. • Construction speed (6th) • Lightness (14th) • Aesthetics (15th) • Stiffness (19th) • Economy (1st) • Efficiency (15th) • Overall (7th)