IS Design and Use

IS Design and Use. LECTURE 8. Information Systems Department. Issues Related to IS Design and Use. To be Covered: Cost Speed Complexity Technology and Innovation Alignment on Objectives Adoption Useful Life. Cost Two components to the total costs:.

odetta
Download Presentation

IS Design and Use

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IS Design and Use LECTURE 8 Information Systems Department

  2. Issues Related to IS Design and Use • To be Covered: • Cost • Speed • Complexity • Technology and Innovation • Alignment on Objectives • Adoption • Useful Life

  3. CostTwo components to the total costs:

  4. Unnecessary works arises from two main sources: • Gold Plating.. • Tendency of users to demand extras- features that they want but don’t add extra value to the system • The worse, is that developers accepting these extras because they look easy and small. • In fact, every time you add a feature, you add to the complexity of the system and to the cost

  5. Unnecessary works arises from two main sources: • Rework.. • It is necessary when you make an error and have to correct it. • If you catch and correct the error right away -- No great damage is done. • If it is not discovered until testing, other work that depends on it, has to be scrapped and redone. • Requirements or architecture error that is discovered in testing costs 1000 times than if it is caught right away • Testing takes up about 50% of total initial development cost just in correcting errors. • 29% of system projects failed before implementation and scrapped with a rework cost of 100%

  6. Speed

  7. Complexity

  8. Complexity • Emergent Properties of Complexity theory: • Just because you are content with designing and coding the software. • It is not enough for you to use the system directly. • When you made a change, you should test all components in test cycle to ensure they work as before

  9. Technology and Innovation • The main drivers of IS development is to exploit Technological Innovation to change & improve the way the business is done

  10. Technology and Innovation

  11. Alignment on Objectives

  12. Adoption

  13. Useful Life • Another issue is how to plan for a system useful life? • Importance of planning 1. To determine whether a new system is worthwhile or not - e.g. a system cost SR 5 million & bring in SR 1 million/annum, Then, the system must have a useful life of at least 5 years.

  14. Useful Life • Importance of planning 2. To decide how and when to withdraw or replace the system. - Most development projects do not address the issue of decommissioning at all. - As a result, systems live for much longer than anyone would have imagined

  15. DONE  Design is more than choosing nice front Thank you for listening