An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAMAGUNDAM-HYDERABAD-KURNOOL-GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP

  2. RAMAGUNDAM-HYDERABAD-KURNOOL-GOOTY LINE • IMPROVED NORTH-SOUTH CORRIDOR CONNECTIVITY • ADDITIONAL ANCHORING OF SRISAILAM EVACUATION SCHEME • LOSSES REDUCED BY 10.4 MW • KURNOOL SC LEVEL IMPROVED FROM 2394 TO 4568 MVA – LESS VOLTAGE EXCURSION • GOOTY SC LEVEL IMPROVED FROM 3484 TO 4512 MVA • ALL THIS WITHOUT CONSIDERING EXTRA 500 MW GENERATOR AT RGM!!!

  3. CLOSING DORMANT 220 KV INTERSTATE LINES WHAT STILL NEEDS TO BE DONE……………….

  4. YERRANDAHALLI-HOSUR :- A SUCCESS STORY • ORIGINALLY CONCIEVED AS 220 KV SINGARPET-PEENYA LINE – COMMISSIONED 24TH NOV 1965 • PEAK FLOW -1985-168 MW-66 MU FOR YEAR • LILO’D AT SOMANAHALLI, YERRANDAHALLI IN KARNATAKA • LILO’D AT HOSUR(OLD), HOSUR(NEW) IN TAMILNADU • DORMANT FOR OVER A DECADE (1992-93) • CHARGED IN RADIAL MODE 7th SEPT 2002 • SYNCHRONISED TO THE GRID ON 7th JAN 04 • ADVANTAGES • LOSS REDUCTION • VOLTAGE IMPROVEMENT • HELPED MITIGATE ICT FLOW AT SOMANAHALLI DURING DISTURBANCE

  5. CLOSING OF 220 KV KADKOLA-KANIAMPETTA LINE • 220 KV KADKOLA-KANIAMPETA PARALLELD ON • VOLTAGE IMPROVEMENT AROUND MYSORE AND KANIAMPETA (ABOUT 2-2.5 KV) • LOSSES REDUCED • RELIABILITY OF SUPPLY AT KADKOLA AND KANIAMPETTA

  6. CLOSING OF 220 KV SEDAM-TANDUR LINE • ADVANTAGES • LOSS REDUCTION BY 4 MW • ALTERNATE PATH FOR NSR-RCH • FLOW WOULD BE IN EITHER DIRECTION • 30% SENSITIVITY TO NSR-RCH TRIPPING • CAN BE SYNCHRONISED ON TRIAL BASIS • PUT ON CLOSEWATCH FOR FEW DAYS