1 / 34

Architect-Engineer Services for Capital Planning

Architect-Engineer Services for Capital Planning. March 15, 2006. Presented to:. The Kennedy Center for the Performing Arts. Agenda. Team Overview Experience Project Implementation Technical Solution Summary. Team Overview The EMG – PEG – MS –SMW Team. Over 80 years combined experience

odina
Download Presentation

Architect-Engineer Services for Capital Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Architect-Engineer Services forCapital Planning March 15, 2006 Presented to: The Kennedy Center for the Performing Arts

  2. Agenda • Team Overview • Experience • Project Implementation • Technical Solution • Summary

  3. Team OverviewThe EMG – PEG – MS –SMW Team • Over 80years combined experience • DC licensed Project Managers • Baltimore-Washington area based team • Familiarity with local building codes • Capital Planning specific experience • Recent successful completion of similar projects

  4. Team OverviewCapability & Qualifications • National Coverage • World Wide Ability & Experience • Local/Government Experience • Available Capacity • Small Business Contracting Experience • Security Clearance • Staff: 100% U.S. Citizen • Prior Clearance Status JFKC Other Projects Total Capacity

  5. Team OverviewClients We Serve

  6. Experience: EMGEMG • 19 Years Experience • Facility Assessment/ Capital Planning Experts • Local, licensed staff • Recent completion of similar Projects

  7. Experience: EMGPatriot Center at George Mason University • 10,000 Seat Arena • Comprehensive Facility Assessments on Three Campuses, Totaling 3.5 M GSF • 20-year Capital Reserve Planning • EMG AssetCALC Capital Planning Application • Integration with Third- Party Maintenance Management Software Application

  8. Experience: EMGUniversity of Virginia • Comprehensive Facility Needs Study including Culbreth and Helms Theatres • Web-Based Data Entry into UVA Legacy Software • Room-by-Room Deficiency Inspection Including Maintenance Issues • Life-cycle Cost Estimating

  9. Experience: EMGGeneral Services Administration • 25 Buildings nationwide totaling over 13 M GSF • Facility Condition Assessment, Cost Estimating, Feasibility Studies • Web-Based Building Engineering Reports (BER) • Repair & Alteration (R&A) projects • Facility Renewal Management • Current Deficiency Management

  10. Experience: EMGArlington County, VA • Facility Condition Assessment; Capital Planning; ADA Review • Cost Estimating • Web-based Database System • 68 buildings, totaling over 1.5M GSF • Libraries • Parks and Recreation Centers/Offices • Courthouses • Fire Stations/Academies • Detention facilities • Department of Transportation facilities • Maintenance facilities

  11. Experience: Protection Engineering TheProtection Engineering Group, PC • Specialized Expertise in Fire Protection, Life Safety and Electronic & Physical Security • Full-Service Engineering Office • Small Business • 14 Employees: 9 Fire Protection Engineers / 3 Security Consultants • Location • Chantilly, VA (20 miles to JFKC) • Services – Fire Protection & Security • Code Consulting • Design • Life Safety / Egress Analysis • Master Planning

  12. Experience: Protection EngineeringThe Kennedy Center • 2002 Comprehensive Building Plan Fire Protection & Life Safety Review • Systems assessed: • Fire alarm • Fire suppression (wet & dry systems) • Life safety systems • Egress paths • Smoke vents • Fire rated barriers • Exit signage and emergency lighting

  13. Experience: Protection EngineeringGeorgetown University • Department of Public Safety – Communications Center • Development and submission of a Systems Engineering Plan • Security plan included • Building access controls • Intrusion detection • Closed circuit television • Surveillance monitoring • Video recording equipment

  14. Experience: Matrix SettlesMatrix Settles • 35Years Experience • Small Business Enterprise • 35 Employees, seven registered architects • Location • Approximately five miles from JFKC • Services • Architecture • Interior Design • Master Planning • Sustainable Design

  15. Experience: Matrix Settles US Department of the Treasury • 5 Year IDIQ contract • Building Evaluation Report for the 141,500 GSF Annex Building • Architecture, engineering, space planning and interior design for projects in the Main Treasury and Annex Buildings

  16. Experience: Matrix SettlesSocial Security Administration • Space and Building Analysis • Occupancy Plan and Schedule • Strategic Project Planning, • Program of Requirements • Space Planning, Design Intent Drawings, Interior Design, Master Project Schedule • Campus of 16 buildings with 4 M SF

  17. Experience: Matrix SettlesVeterans Affairs Regional Headquarters • Prospectus Development Study for the construction of a new, 470,000 SF • Occupancy Plan and Schedule • Spatial Data Validation • Integrated Workplace Planning • Strategic Project Planning • Program of Requirements • Space Planning, Design Intent Drawings and Interior Design

  18. Experience: SM&WShen, Milsom, & Wilke, Inc • 20 years in Experience • 11 offices worldwide • Minority Business Enterprise • Experience with John F. Kennedy Center for the Performing Arts • Audiovisual, Multimedia, Telecommunications, and Security Services

  19. Experience: SM&WTheKennedy Center Visitors Orientation Desk & Kiosks • Existing conditions & available conduit pathway study • Design Services - 3 interactive kiosks • Hall of States, the Hall of Nations and the Great Hall • Design recommendations - Media Distribution Center Assessments and audits

  20. Team Qualifications

  21. Team Qualifications

  22. Management Approach • Kick-off Meeting • Review of Existing Documentation • Facilities Condition Assessment • Specialty Analysis • Progress Meetings and Presentations • Reporting and Deliverables

  23. Project ImplementationManagement Plan • Kick-off Meeting • Communication • Program Manager • Review of Existing Documentation

  24. Organization & Procedures • Confirm and Develop Objectives • Clarify Roles and Responsibilities of the Project Team • Provide Project Schedule • Objectives & Goals • Workshops • Meetings with JFKC

  25. Project ImplementationFacility Condition Assessment • Project Approach • Review existing documentation • Document major systems and building components • Identify deficiencies and lifecycle replacements • Cost solutions for deficiencies • Sorting data by facility, priorities, categories, cost, and deficiency type • Tablet PC • Standardized collection • Database format • Data validation • Data into existing database

  26. Data Gathering • Interview JFKC Personnel • Review Existing Documentation • Survey the Building • Report Preparation • Update Code Summary Using Current Building Codes • Prepare List of Recommended Life Safety/Security Projects • Provide Input in Developing Cost Estimates

  27. Data Collection & Analysis • External Traffic Patterns • Internal Vehicle and Pedestrian Circulation • Way Finding and Graphic Systems • Architectural Character and Quality • Environmental Concerns • Utility Service and Central Plan • Security Issues

  28. Concept Development • Prepare List of Potential Capital Projects • Prepare List of Potential Maintenance Issues • Observations for Discussion with JFKC

  29. Project ImplementationDeliverables • Standard Reporting • Drafts • Narratives, tables, and photologs • Finals • Hard copies, electronic versions, and cost tables

  30. 30 Technology SolutionAssetCALC™ Database • Features • Non-proprietary • Tailored Reports • Standard Reports • Benchmarking • Integration • Single User • Multi-user • Remotely Hosted • Training Proprietary & Confidential

  31. Project Implementation Facilities Study • AssetCALCTM Reporting • Standard Reports • Benchmarking • By building • By system • With other facilities • Features • Tailored reports • Standard reports • Benchmarking

  32. Reports

  33. Why Team EMG? • Previous experience with the Kennedy Center • Local Licensed Engineers and Architects • Availability and capacity for project requirements • Credentials in the area of government facilities • Proven methodologies and management plan • Data collection & database solution

  34. EMG Contact Matthew S. MunterSr. Vice President 800.733.0660 Ext. 2709msmunter@emgcorp.com

More Related