190 likes | 363 Views
Senior Design Fixture Analysis. ME 450: Finite Element Analysis Dr. K Nema Final Project Javier Angulo Matt Schonauer Avery Sheets. Overview. Introduction Background Model Details Analysis and Results Conclusions. Introduction.
E N D
Senior Design Fixture Analysis ME 450: Finite Element Analysis Dr. K Nema Final Project Javier Angulo Matt Schonauer Avery Sheets
Overview • Introduction • Background • Model Details • Analysis and Results • Conclusions
Introduction • Analysis will be done on a fixture designed for ME 462: Capstone Design • Project sponsor is Remy, Inc • Out of Anderson, IN • The analysis will be purely structural • Von Mises stresses • Deflection/Deformation
Background • Remy designs and manufactures starters
Background • Most analysis of products is done using FEA • Testing is usually a “break it” test • Tests aren’t universal and standardized • No reliable way to compare current products to competitor products
Background • Force transmission path through individual components
Background • The particular fixture being tested will be used to connect the drive shaft to the torsion machine • The pin end will be held by the fixture
Analysis and Results • Attempt #1 • This method would not provide any moment at all • There is no implementation in Workbench to apply a pressure on part of a surface
Analysis and Results • Attempt #2
Analysis and Results • Attempt #3 • An okay approximation, but not quite accurate • Placement of point forces based solely on clicking the mouse • This discrepancy caused forces to be unbalanced
Analysis and Results • Results from the last analysis indicated that the point of high stress was indeed the base of the triangular part • Rounds were added at the intersection of the circular base and the triangular chuck
Analysis and Results • Surfaces can be split into multiple surfaces in Pro Engineer • The force of the torsion machine exerted on the triangular chuck could be better modeled
Analysis and Results • Pro Engineer problems • Deleted features still stored in the database • Had to create a completely new part
Analysis and Results • Maximum torque that can be applied is 1130 Nm
Analysis and Results • Maximum von Mises stress is 48.51 MPa • Maximum deflection is 0.004 mm (negligible)
Conclusions • Design was approved through FEA using a combination of Pro E and ANSYS Workbench • Good example of the importance of learning the theory behind FEA