380 likes | 518 Views
Making the Rocket Equation Work for Us (not against us) H. Keith Henson, Founder L5 Society. The new idea is:. A way to raise a half million tons a year to GEO at a cost of less than $100/kg Space based solar power for a penny a kWh, synthetic fuels made from that power for $1 a gallon
E N D
Making the Rocket Equation Work for Us(not against us) H. Keith Henson, Founder L5 Society
The new idea is: • A way to raise a half million tons a year to GEO at a cost of less than $100/kg • Space based solar power for a penny a kWh, synthetic fuels made from that power for $1 a gallon • Enough energy to put carbon back in the ground if we need to
Pop up and push • 290t rocket, less than a 747 • 320 km sub orbital apogee, • Mass ratio 3.2 • 200t propellant • 50t structure, 16.5 % (Aircraft) • 40t laser stage (later 50t, ½ PL)
Laser stage • Mass ratio 2.7 • 25.5 t propellant • 14.5 t payload • 5.6-15.3 km/sec Ve • 12 km/sec in 905 seconds. • No gravity or air drag loses
Delta V • Earth surface to LEO 10 km/sec • Earth surface to GEO 14 km/sec • Earth surface to 160 km sub orbital, mass ratio 3 SSME Ve, 4km/sec less 1.4km/sec gravity and .6km/sec air drag 2k/sec net • Need additional 12 km/sec. • Mass ratio of 3, 12 km/sec Ve, • Mass ratio of 2, 17 km/sec Ve • GEO to 1986 DA 0.14km/sec
Ablation Laser • 8 GW in, 4 GW out, 800 5 MW modules • Little over 1 g • Requires 800 five ton focusing mirrors at GEO • (bootstrap the mirrors)
Optimum split 40t, 14.5 Payload1.1 g, miles vertical axis, NM horizontal
Geometry/Geography • GTO injection about 2600 NM down range • Needs to be on Equator • Best 5000km water to east • Good choices for US, EU
Location GPS of our private airport: S. 00º 06’ W. 049TH 35'
Lasers 45 deg to the WestWinnie Texas 29°49′8″N 94°23′0″WOn I10, between Houston and Beaumont. Alternately with a few degrees off vertical we could go as far as Corpus Christi 97.4, Brownsville 96.5 or Laredo 99.48
Launch every 15 minutes • 96 flts/day, 60-100 rockets • Growth with more laser • Rocket life 20 years at 600 flights/year • Aircraft type maintenance
Cost/kg • 14.5 ton payload, 1392 t/day • Half a M t/year, half a Billion kg • $40 B lasers at $10/W • $60 B rockets, launch infrastructure. • $10B/year write off, $20/kg • Double for operating cost $40/kg • Double for sub orbital lift $80/kg
Digression, Scope of the energy problem • 27 billion tons of CO2 into the atmosphere every year from producing energy (27 cubic km as liquid CO2) • About half from oil and gas, half from coal
Failing to replace the energy has dire consequences (at least some think so)
Mitigation Requires Energy • Geo-Engineering problem is to make these sources go away by technical means • To end use of fossil fuels, a replacement of 15-30 TW is needed. 56% to liquids
Big Energy Sources • Nuclear has well known problems • Power satellites--invented 40 years ago by Dr. Glaser of ADL • The problem with any energy solution is that there are fools in high places who want a collapse (Club of Rome meeting in Houston Nov. 1975 and recent)
Equipmentcost? Sasol’s • 34,000bbl/day plant, $1 B • $30,000/bbl • 300 days a year, $100/bbl of capacity • 10 year write off $10/bbl • NOT counting the CO2 capture plant
2.4 MWh/bbl of synthetic oil. At 10 cents/kWh, $240/bbl, $6-8/gal fuel. At penny a kWh, $24/bbl The energy cost is in making hydrogen
US Oil use is 20 Mbbls/day • 100 MW 1000bbls/day • 100 GW 1 Mbbls/day • 2000 GW 20 Mbbls/day • 4 times the current US electrical capacity
But at an installation rate of 500 GW/year it takes only 4 years for enough power to replace all the oil the US uses. Five years if we replace the coal power plants first. 2 TW is a lot of power
The only source that scales into 500GW/yr at low unit cost is solar power satellites (potentially anyway)
What does it take to get penny/kWh power? • 8000 hr/year, $80/year revenue • $800 for a ten years pay off • An installed kW should not cost more than ~$800 • Compare, nuclear plants at $5000 to $8000/kw
If half the cost is rectenna and parts and the power sat mass is 4kg/kW then lift cost for 4kg can’t exceed $400 or$100/kg.Current rocket launch to GEO at $20,000/kg is about 200 times too expensive.
Geo-Engineering Scale • Lifts10,000 t in 7 days, at 2kg/kw 50 5GW power sats/year, 250GW/year • At 4kg/kw, 125GW/year • 2-4 years to shut down US coal plants or sell 125-250GW/year to the Chinese and Indians who don’t build additional coal plants • Who gets carbon credits?
Crash Bootstrap Buildout • 2015 25-50 5GW Power sats/year. Half fed back. • 2020 100 5GW/year • 2025 200 5GW/year. • 2050 30+ TW, Fossil fuels totally displaced worldwide
Goals for next 40 years • At least double the energy available to humans to 30TW without releasing more carbon • Solve climate change, stop the rise and pull the CO2 level down to where ever desired--50TW, 12 years pulls down100 ppm making oil
Hkhenson@rogers.comhttp://www.htyp.org/dtc (short link) http://www.htyp.org/Dollar_a_gallon_gasolinehttp://www.htyp.org/Penny_a_kWhhttp://www.htyp.org/Hundred_dollars_a_kghttp://www.htyp.org/Miller%27s_method