1 / 49

Comprehensive Transportation Plan (CTP): What is it?

Madison County Comprehensive Transportation Plan (CTP ) Madison County Board of Commissioners Meeting Marshall, NC. Comprehensive Transportation Plan (CTP): What is it?. Long range multi-modal transportation plan for a town/city, group of towns/cities, or a county

olesia
Download Presentation

Comprehensive Transportation Plan (CTP): What is it?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Madison County Comprehensive Transportation Plan (CTP)Madison County Board of Commissioners MeetingMarshall, NC February 11, 2011

  2. Comprehensive Transportation Plan (CTP): What is it? • Long range multi-modal transportation plan for a town/city, group of towns/cities, or a county • Concept for broad range of improvements over 25-30 year planning period, NOT financially constrained • Vision Plan, No funding attached • Developed cooperatively: NCDOT & local stakeholders • Incorporates Land Use plans, community & statewide goals • Elements Include: • Highway • Public Transportation & Rail • Bicycle • Pedestrian

  3. CTP: What is it? (cont’d) • Current & future conditions • Lanes, Right-of-Way (ROW), volume, capacity • Level Of Service (LOS), congestion, safety • Deficiencies & recommended improvements • For all modes • Final product • CTP = maps showing recommended improvements • Technical report

  4. The Road goes HERE!! A Comprehensive Transportation Plan DoesNOT... • Make a promise to build roads. • Determine a pinpoint location of new roads. We will build this road for you!

  5. CTP: Why is it Needed? • Analysis and recommendations are a basis for project prioritization by the Rural Planning Organization (RPO) • Projects must be in a mutually adopted CTP to be eligible for inclusion in NC Transportation Improvement Program (NCTIP) • Use CTP recommendations to protect right of ways • Coordinated Subdivision and Land Use Controls

  6. Project Development Process Long-Range Planning Determining the Need We are here in the process Program Development Funding the Projects Project Planning Minimizing the Impacts Project Design Design & ROW Construction, Maintenance, Operations Building & Maintaining the Road

  7. CTP: Who is involved? • NCDOT • RPO • Local stakeholders • County • Towns • Business interests: Retail, Office, Industrial • Other modes: Bus, Rail, Bicycle, Pedestrian • Environmental interests

  8. CTP: What are the steps? • Requires land development plan • Form a CTP Steering Committee • Goals & Objective Survey – Public Involvement • Vision statement • Network: roads to study • Data collection/Future projections • Analysis – Base Year (2009) and Future Year (2035) • Presentation to Steering Committee and Officials • Test Alternatives • Preliminary Recommendations • Public Involvement (Nov 2010 @ Marshall, Mars Hill, Hot Spring) • Final Recommendations/Adoption/Endorsement

  9. CTP Steering Committee • Composed of representative from: • Madison County • Marshall • Mars Hill • Hot Springs • NCDOT Division & District Office from Division 13 • NCDOT TPB • Land-of-Sky RPO Staff

  10. Role of CTP Steering Committee • Coordinate with county/town councils, planning boards • Develops vision statement • Agrees on roads to be studied • Assists with public involvement and survey • Reviews plan as it is developed (consistency with vision) • Assists with adoption & endorsement • Municipalities, County Board of Commissioners, RPO, NCDOT

  11. Question ???? Recommendation: • Highway • Rail & Transit • Bicycle • Pedestrian

  12. Highways Recommendations 1. US 19 Widening – from I-26 to Yancey County line (NCTIP project # R-2518A – under construction) Existing Recommended Lanes: 2-lane rural Lane: 4-lane divided Boulevard 2009 ADT: 7,800 to 9,700 Capacity: 60,700 vpd 2035 ADT: 16,700 to 21,800 Speed: 55 mph Speed: 55 mph Capacity: 15,800 vpd Purpose: Add capacity to alleviate future traffic congestion

  13. Highways Recommendations (cont.) • NC 213 Bypass – from existing NC 213 (Carl Eller Rd) just west of I-26 Interchange to existing NC 213 (Cascade Rd) in the vicinity of Gabriels Creek Rd NC 213 (without Bypass) Recommend NC 213 Bypass Lanes: 2-3 lane Lanes: 2-lane 2009 ADT: 9200 to 12000 vpd 2009 ADT: NA 2035 ADT: 15300 to 20100 vdp 2035 ADT: 12,000 vpd Speed: 25 – 35 mph Speed: 45 mph Capacity: 9300-13900 vpd Capacity: 15,800 vpd Purpose: • Provide alternate route for through trip travel in Mars Hill area. • Alleviate future travel congestion on existing NC 213 • Enhance Safety by minimize future vehicle/pedestrian conflict in the Mars Hill downtown, especially through the Mars Hill College area

  14. Highways Recommendations (cont.) 2. US 25/US 70 Widening (Marshall) from NC 251 to North Main Street (US 25/US70 Bus) Existing Recommended Lane: 2-3 lane Lane: 4-lane divided Boulevard 2009 ADT: 8,700-11500 vpd Speed: 45-55 mph 2035 ADT: 16400-21900 vpd Capacity: 60,700 vpd Speed: 45-55 mph Capacity: 13900-15800 vpd Purpose: Add capacity to alleviate future traffic congestion

  15. Highways Recommendations 3. Little Pine Rd/NC 63 Connector (including improving existing Little Pine Rd) from US 25/US 70 in Marshall to NC 63 near Spring Creek Community (NCTIP Project # FS-0513A) Existing Propose Connector Lane: 2-lane (18-20 ft pavement) Lane: 2-lane (24ft pave) 2009 ADT: 500-1400 vdp 2035 ADT: 1300-4400 vpd 2035 ADT: 1000-2900 vpd Speed: 35 mph Speed: 35 mph Capacity: 15800 vdp Capacity: 7,400 vpd Purpose: To provide alternate route between NC 63/209 and US 25/US 70 To provide safer travel environment and better connectivity

  16. Highways Recommendations 4. Widen Bruce Road from North Main Street to Riddle Rd Existing Recommended Lane: 2-lane (16 ft pavement) Lane: 2-lane (24ft pave) 2009 ADT: 800 vdp Speed: 25-35 mph 2035 ADT: 1500 vpd Speed: 25 mph Capacity: 7,200 vpd Purpose: To provide safer travel environment for school buses from Mars Hill Elementary School

  17. Highways Recommendations 5. Add left-turn lane on Main Street at NC 213 in downtown Mars Hill Purpose: To improve capacity on Main Street and to improve travel efficiency at Main/NC 213 intersection

  18. Boulevard Facility • Moderate mobility, moderate access • 30 to 55 mph • Minimum 2 lanes with a median • Connections: At-grade intersections for most major and minor cross streets • Driveways allowed – primarily right-in/right-out; encourage consolidation and/or sharing of access • Examples: US 1 in Raleigh, NC 55 (Holly Springs Bypass), US 70 between Clayton and Smithfield US 70 East of Goldsboro Cary Parkway

  19. Expressway Facility • High mobility, low access • 45 to 60 mph • Minimum 4 lanes with a median • Connections: Interchanges (major cross streets) and at-grade intersections (minor cross streets) • Driveways are limited in location and number; right-in/right-out only • Traffic signals not allowed • Examples: US 117 north of I-40, US 74 just east of I-277 in Charlotte US 221 (Marion Bypass) US 220 in Rockingham County

  20. Freeway Facility • High mobility, low access • 55 mph or greater • Minimum 4 lanes with a median • Connections provided only at interchanges; all cross streets are grade-separated • Driveways not allowed • Traffic signals not allowed • Examples: I-40, I-26, US 64 between Rocky Mount & Williamston, US 1 between Raleigh and Sanford US 74 Near Waynesville US 264 East of I-95

  21. Major/Minor Thoroughfares • Balanced mobility and access • 25 to 55 mph • Minimum 2 lanes, no median; includes facilities with a continuous left turn lane • Connections: At-grade intersections • Driveways allowed with full movements; consolidate or share connections if possible • NC and US routes are always Major • Examples: NC 86 north of Hillsborough, US 64 in Siler City, US 70 through Kinston, NC 168 in Currituck County US 441 South of Dillsboro US 13 North of Ahoskie

  22. Transit & Rail Recommendations • Express bus service from Downtown Asheville to Mars Hill (recommended in the French Broad River MPO CTP and LRTP) • Park and Ride lot off of Calvin Edney Rd north of NC 213/I26 Interchange • Park and Ride lot off of NC 251 between US 25/US 70 and US 25/US 70 Bus

  23. Bicycle Recommendations • Multi-Use Path – along NC 251 from Buncombe County line to US 25/US 70 • Share the Road signs on NC 213 between Mars Hill and Marshall (NCDOT will need to perform analysis of road before installing)

  24. Pedestrian Recommendations • Multi-Use Path – along NC 251 from Buncombe County line to US 25/US 70 • Upgrade a number of older sidewalks in downtown areas to ADA Compliance • Fill in gaps in downtown sidewalk networks • Add pedestrian path connecting NC 213 to Mountain View St in Mars Hill

  25. CTP Adoption Maps • Adoption Sheet • Highway Map • Highway Map Inset • Rail and Transit Map • Rail and Transit Map Inset • Bicycle Map • Pedestrian Map • Pedestrian Map Inset

  26. Proposed Inclusion of Marshall Bike & Pedestrian Plan in CTP documentation • Include a referral of the Marshall Comprehensive Plan in the Bike & Pedestrian Chapter of the CTP documentation (ie, Town of Marshall has adopted a Comprehensive Land Use Plan in 2009. It is recommended that the Town uses this Plan as a basis to implement the Bicycle and Pedestrian Plan (Figure 3-1)** in the area. In addition, the Town will work with the Bicycle & Pedestrian Unit of NCDOT on a more detail Bicycle and Pedestrian Plan for the area. The Madison County CTP will be amended to include this plan once the it is completed.) ** Marshall’s Bike & Ped Plan is included as Figure 3-1

  27. CTP Completion Schedule: • Adoption by Towns in Madison County • Mars Hill – Adopted December 6, 2010 • Marshall – Adopted January 19th, 2011 • Hot Spring – February 7, 2011 • Endorsement by Land-Of-Sky RPO – February 2011 • Adoption by NCDOT Board of Transportation – March 2011 • Completion of Technical Documentation – End of March 2011 • CTP Study Close Out – End of April 2011

  28. NCDOT Contacts • Transportation Planning Branch (CTP): • Linh Nguyen, PE, lnguyen@ncdot.gov, (919) 715-5737, ext. 67 • Highway Design Branch – R-2518A US-19 Widening • Thad Duncan, tfduncan@ncdot.gov, (919) 250-4016 • District Engineer: • Jeff Moore, PE, jhmoore@ncdot.gov, (828) 298-2741 • Board of Transportation Member: • Wanda Proffitt • Land-Of-Sky Rural Planning Organization: • Natalie Murdock, Natalie@landofsky.org, (828) 251-6622

More Related