BTM 024 qualification

BTM 024 qualification. MRB Meeting – dd month yyyy. Description and reference documentation. Description of nonconformance Problem description Instances Where was it found Suspected Root cause description Reference NCR List NCR n. Vacuum test. Vacuum test

Download Presentation

BTM 024 qualification

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BTM 024 qualification MRB Meeting – dd month yyyy

  2. Description and reference documentation • Description of nonconformance • Problem description • Instances • Where was it found • Suspected Root cause • description • Reference NCR List • NCR n

  3. Vacuum test • Vacuum test • Performed in the vacuum chamber in INFN-Roma 2. • Tray connected to the readout electronics by means of a single flex cable in order to minimize the number of the lines to be brought out of the vacuum chamber (all the FE chips read by the left GTRC). • ~20 hours @ P < 0.1 mbar, room temperature (~25 C). • Noise and gain of each single channel continuously monitored throughout the test.

  4. Vacuum profile

  5. Functional tests • Functional tests • Test suite run continuously during the night. • Noise and gain measured at the level of the single strip every ~15 minutes. • 80 tests performed in total, no failures detected. • One noisy channel since the beginning, no more channels were lost during the test.

  6. Thermal cycles • Thermal cycles • Performed in the climatic chamber @ INFN-Pisa. • Tray connected to the TEM through both flex cables. • 4 complete cycles from -15 C to + 45 C (standard tray thermal cycles). • Noise and gain and noise occupancy of each single channel continuously monitored throughout the test.

  7. Functional tests • Functional tests • Test suite run continuously throughout the whole test. • Noise and gain/noise occupancy measured at the level of the single strip every ~15 minutes. • 93 tests performed in total, no failures detected. • Final complete test suite after the thermal cycles successfully performed.

  8. Conclusion • Description of nonconformance • Problem description