1 / 15

EIA’s

EIA’s. Environmental Impact Assessments. EIA’s. Required in many countries before any kind of development takes place Determines The type and degree of impact on the environment Potential modifications to the developments design The feasibility of introducing these modifications

Download Presentation

EIA’s

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EIA’s Environmental Impact Assessments

  2. EIA’s • Required in many countries before any kind of development takes place • Determines • The type and degree of impact on the environment • Potential modifications to the developments design • The feasibility of introducing these modifications • This information is needed before governments will approve the development

  3. Types of developments that require EIAs • Resource exploitation • Mining, forestry, smelting • Transport • Roads, rail, airport • Establishing industry • Factories, processing plants, oil refineries • Urban development • Buildings, subdivisions, infrastructure (electricity, water, sewer) • Waste disposal

  4. Investigation • Conducted by government approved and independent environmental consulting firms that are hired by the company proposing the development.

  5. Problem with EIAs • Governments are responsible for their implementation • The issue may become politically charged where human concerns and interests override those of the environment. • This makes the process open for corruption.

  6. What is included in an EIA? An EIA must establish the conditions of the environment before the development has a chance to change things.

  7. Step 1 • Baseline study • Establishes the natural conditions present in the ecosystem before the proposed development is constructed.

  8. Step 1 • The following variables are established • All aspects of the biosphere • Direct methods • Known pollutants • Nitrates from sewer • Noise from traffic • Indirect Methods • Biodiversity

  9. Step 1 • Sampling methodology • Frequency • Number of samples • Location and distribution of the sampling • Purpose is that establish a clear picture of initial conditions and show how the environment will change

  10. Step 1 • Environmental Considerations • Establish what kind of features will be incorporated into the development to minimize the impact of the development. • Waste disposal • How will waste generated during the construction and use phase of the project be disposed of?

  11. The baseline study is normally the most intensive aspect is an EIA as its scope is larger in area and types of samples analyzed than future sampling programs which are normally more specific as the known impact of the development is clearer

  12. Step 2 • Ongoing monitoring during construction and use of the development plan • Used to prove that the development is not impacting the environment

  13. Step 3 • Site remediation • Often forgotten when designing a new development is what will happen to the site once the development has outlived its use.

  14. Step 3 • Some EIAs will be required to suggest how the development will be reclaimed and returned to its natural habitat. • Eg. mining

  15. Step 3 • If this step does not meet the government requirement, the project may still be refused even though steps 1 and 2 have been met.

More Related