20 likes | 136 Views
Topic Action Items:. D. Target Hall (I. Bailey on behalf of V.B.) Evaluate dose rates for short times after shutown (1 hour, 1 day) - Andriy (DESY) Complete detailed target station geometry for FLUKA - Luis (DL) Include material absorption effects in FLUKA simulations - Andriy (DESY)
E N D
Topic Action Items: • D. Target Hall (I. Bailey on behalf of V.B.) • Evaluate dose rates for short times after shutown (1 hour, 1 day) - Andriy (DESY) • Complete detailed target station geometry for FLUKA - Luis (DL) • Include material absorption effects in FLUKA simulations - Andriy (DESY) • Carry out benchmarking of FLUKA using Ti alloy at SLAC - John (SLAC) • Get feedback on impact of 53 hour changeover on availability - Vinod (SLAC) • Evaluate need to include photon collimator in remote-handling module - Lei (Liverpool) • Evaluate activation of water in water-cooled systems - Andriy (DESY) • Evaluate shielding requirements compatible with 53 hour remote-handling schedule - Andriy (DESY) • Evaluate acheivable vacuum. Assess need to evolve pillow seal design. - Ian (Liverpool) • Does ILC plan to have a central hot cell facility? - Vinod (SLAC) • Develop detailed remote-handling scenarios - Mike W (RAL) • Assess need for remote-handling for KAS - Vinod (SLAC)
Topic Action Items: A. Target Systems (I. Bailey/ T. Piggott) • Source alternative magnet solutions for first proposed UK target prototype - Ian B to coordinate. • LLNL to evaluate DL target prototype design for vibrational modes and compatability with water-cooling design (flow rates, etc) - Tom P to coordinate. • Rationalise proposed UK prototyping wrt available funding - Ian B to coordinate. • Continue evaluation of alternative target materials - Chris D to coordinate. • Seek further clarification from BINP on their 1ms OMD work - Vinod B to coordinate. • Adopt common geometry for eddy current simulations (based on UK prototype?) - Jeff G to coordinate. • Beam window issue remains unresolved? Wei + Alexander to discuss.