1 / 2

Topic Action Items:

Topic Action Items:. D. Target Hall (I. Bailey on behalf of V.B.) Evaluate dose rates for short times after shutown (1 hour, 1 day) - Andriy (DESY) Complete detailed target station geometry for FLUKA - Luis (DL) Include material absorption effects in FLUKA simulations - Andriy (DESY)

omana
Download Presentation

Topic Action Items:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Topic Action Items: • D. Target Hall (I. Bailey on behalf of V.B.) • Evaluate dose rates for short times after shutown (1 hour, 1 day) - Andriy (DESY) • Complete detailed target station geometry for FLUKA - Luis (DL) • Include material absorption effects in FLUKA simulations - Andriy (DESY) • Carry out benchmarking of FLUKA using Ti alloy at SLAC - John (SLAC) • Get feedback on impact of 53 hour changeover on availability - Vinod (SLAC) • Evaluate need to include photon collimator in remote-handling module - Lei (Liverpool) • Evaluate activation of water in water-cooled systems - Andriy (DESY) • Evaluate shielding requirements compatible with 53 hour remote-handling schedule - Andriy (DESY) • Evaluate acheivable vacuum. Assess need to evolve pillow seal design. - Ian (Liverpool) • Does ILC plan to have a central hot cell facility? - Vinod (SLAC) • Develop detailed remote-handling scenarios - Mike W (RAL) • Assess need for remote-handling for KAS - Vinod (SLAC)

  2. Topic Action Items: A. Target Systems (I. Bailey/ T. Piggott) • Source alternative magnet solutions for first proposed UK target prototype - Ian B to coordinate. • LLNL to evaluate DL target prototype design for vibrational modes and compatability with water-cooling design (flow rates, etc) - Tom P to coordinate. • Rationalise proposed UK prototyping wrt available funding - Ian B to coordinate. • Continue evaluation of alternative target materials - Chris D to coordinate. • Seek further clarification from BINP on their 1ms OMD work - Vinod B to coordinate. • Adopt common geometry for eddy current simulations (based on UK prototype?) - Jeff G to coordinate. • Beam window issue remains unresolved? Wei + Alexander to discuss.

More Related