1 / 10

TTA PG707 Status Report

CJK-IMT 25-xxx. TTA PG707 Status Report. CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr). CJK IMT 25 Beijing, China May 19, 2010. Contents. Introduction. PG707 Work Scope. Updates of Current Activities. Future Plans : PG707. Mobile Communication Technical Committee (TC7). IMT-Advanced PG

omana
Download Presentation

TTA PG707 Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CJK-IMT25-xxx TTA PG707 Status Report CHUNG, HyunKyu (HK) (hkchung@etri.re.kr) CJK IMT 25 Beijing, China May 19, 2010

  2. Contents Introduction PG707 Work Scope Updates of Current Activities Future Plans : PG707

  3. Mobile Communication Technical Committee (TC7) IMT-Advanced PG (PG701) IMT WiBro PG (PG702) Mobile Platform & Service PG (PG703) WLAN PG (PG704) Cognitive Radio PG (PG705) VHO PG (PG706) IMT Evaluation PG (PG707) 1. Introduction : PG707 Positioning • ToR (Terms of Reference) of PG707 • Evaluate for proposed RIT/SRIT of IMT-Advanced • Develop evaluation report / Submit evaluation report to ITU-R • Cooperate and coordinate with international/domestic standardization • bodies related to evaluation • ITU-R WP5D, 3GPPs, IEEE 802, SDOs

  4. 2. PG707 Work Scope • Evaluation Targets • 3GPP LTE-Advanced • Contributions from Individual Members(IM) for 3GPP self-evaluation. • PG707 internal evaluation to be harmonized with IM’s contributions. • IEEE 802.16m • Contributions from Individual Members(IM) for IEEE self-evaluation. • PG707 internal evaluation to be harmonized with IM’s contributions. • (WG7028 under PG702 are preparing Self Evaluation as a proponent) • Evaluation Scope • Full scale evaluation for FDD /TDD of 802.16m • Full scale evaluation for FDD of LTE-Advanced • Confirm performance reported by the proponent

  5. 3. Activities on Evaluation • Submission of the preliminary evaluation reports • As an IEG of WP5D, TTA PG707 submitted two preliminary evaluation reports on the candidate IMT-Advanced (s)RITs in the 7th meeting of WP5D. • (5D/652) 3GPP LTE Release 10 & beyond (LTE-Advanced) • (5D/653) Based on IEEE 802.16 • We focused on the simulation works • Cell spectral efficiency • Cell edge-user spectral efficiency • VoIP capacity • Our simulation results have similar values from proponent's self evaluation results which meet the minimum requirement of IMT-Advanced technology

  6. 3. Activities on Evaluation • Drafting Group (DG) Activities • We have organized two sub-DGs for developing the evaluation reports • IEEE Sub-DG • LTE Sub-DG • The evaluation report will be made based on the contributions from IMs • We have conducted simulation works based on the simulation configuration presented in the proponent's self-evaluation • Assessments by analysis and inspection are considered • Verify the results based on the proponent’s self-evaluation and discussion results of the Correspondence Group of WP5D

  7. 3. Activities on Evaluation • Schedule for developing the evaluation reports • 05 December 2009: 1st call for the evaluation results • 31 December 2009: Develop the initial preliminary evaluation reports • 29 January 2010: Finalize the preliminary evaluation reports • February 10 2010: Submit the preliminary evaluation reports to ITU-R • 30 April 2010: 2nd call to the participants for the final evaluation. • 28 May 2010: Finalize the final evaluation report • 02 June 2010: Submit the final evaluation report to ITU-R

  8. 3. Activities on Evaluation • Participation in the 2nd workshop and meeting • As an IEG of WP5D, TTA PG707 participated in the following workshop and meeting • IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting (May 17, 2010, Beijing, China) • 3GPP LTE-Advanced Evaluation Workshop (May 18, 2010, Beijing, China) • TTA PG707 presented on a status and final result of evaluation for two candidate IMT-Advanced (s)RITs.

  9. 4. Future Plans : PG707 • Finalization and submission of the final evaluation reports • As an IEG of WP5D, TTA PG707 will submit final evaluation reports on two candidate IMT-Advanced (S)RITs to the 8th meeting of WP5D • Full scale evaluation (Analysis, Inspection, Simulation) including, • Compliance template for services • Compliance template for spectrum • Compliance template for technical performance • Update the Simulation Results • Full buffer performance • Mobility performance

  10. Thank you www.tta.or.kr

More Related