Supply Point Administration – Facilitation of Faster Switching

Supply Point Administration – Facilitation of Faster Switching. MOD 477. The Secretary of State recently challenged the industry to speed up the switching process, but without compromising quality of service, consumer rights, or adding to bills

Download Presentation

Supply Point Administration – Facilitation of Faster Switching

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supply Point Administration – Facilitation of Faster Switching MOD 477 • The Secretary of State recently challenged the industry to speed up the switching process, but without compromising quality of service, consumer rights, or adding to bills • There is an expectation that changes should be made as soon as possible (by the end of 2014), to ensure that early benefits are provided to consumers • Energy UK established a working party to address this challenge, examining a number of options in conjunction with Ofgem and others, to identify changes required across both gas and electricity arrangements • The switching process currently takes a total of 5 weeks where a cooling-off period is required (2 weeks for cool off and 3 weeks for industry process) • Mod 477 is simplistic in its aims and solution as it seeks to trim the existing industry element of the switching process by 5 working days by reducing the Confirmation Window • Alongside process changes to be made by Suppliers (submission of the confirmation file to xoserve within the cooling-off period) this proposal will reduce the overall process timeline to 2 weeks plus 2 working days, known as the ‘2 plus 2’ solution • Xoserve have been engaged with the development of this proposal and have started to consider potential changes required to existing processes and flows – an indicative implementation lead time of 10 months has been advised • We therefore seek prompt progression of this proposal through the modification process with the Final Modification Report being presented to the April Mod Panel for panel recommendation (at the latest) 1

More Related