WORK COMPLETED AGAINST BAD POINT PHOTO GRAPHY.

MAINTENANCE DEPARTMENT - ZONE NO.02. WORK COMPLETED AGAINST BAD POINT PHOTO GRAPHY. CHOP SAW CUTTING MACHINE. AFTER – WIRING MADE PROPER THROUGH CASING CAPING. DOOR CLOSED PROPERLY. DANGER BOARD DISPLAYED ON DOOR FOR SAFETY. BEFORE – DOOR OPEN. UNSAFE WIRING. CHOP SAW CUTTING MACHINE.

omar-welch
Download Presentation

WORK COMPLETED AGAINST BAD POINT PHOTO GRAPHY.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAINTENANCE DEPARTMENT - ZONE NO.02 WORK COMPLETED AGAINST BAD POINT PHOTO GRAPHY.

  2. CHOP SAW CUTTING MACHINE AFTER – WIRING MADE PROPER THROUGH CASING CAPING. DOOR CLOSED PROPERLY. DANGER BOARD DISPLAYED ON DOOR FOR SAFETY BEFORE – DOOR OPEN. UNSAFE WIRING

  3. CHOP SAW CUTTING MACHINE BEFORE – LAYING IN UNSAFE CONDITION AFTER – FIXED IN IDENTIFIED PLACE WITH PROPER WIRING

  4. AFTER – CABLE DUCTING MADE WITH PLYWOOD COMPRESSOR ROOM – DISTRIBUTION PANEL BEFORE – UNSAFE CABLE WIRING

  5. COMPRESSOR ROOM - DISTRIBUTION PANEL BEFORE – FN SWITCH DOOR NOT CLOSE PROPERLY , UNSAFE CONDITION AFTER – SWITCH INSTALLED PROPERLY AND DOOR CLOSED. MAINTAIN SAFE CONDITION

  6. COMPRESSOR ROOM WATER TANK - INCOMING PIPE LEAKGE REMOVED. BEFORE AFTER

  7. COMPRESSOR ROOM - HOIST MATERIAL KEPT NEATLY IN RACK & AREA CLEANED. BEFORE AFTER

  8. COMPRESSOR ROOM AFTER – HOIST AND COMPRESSOR MATERIAL SORTED OUT AND KEPT NEATELY IN RACK BEFORE – COMPRESSOR AND HOIST MATERIAL MIXED TOGETHER AND SCATTERED ON FLOOR

  9. D.G.ROOM – MATERIAL IN WORKER LOCKER , KEPT NEATLY WITH IDENTIFICATION BEFORE AFTER

  10. MAINT. ROOM - LINING MATERIAL KEPT NEATLY WITH COVERING BEFORE AFTER

  11. PUMP HOUSE - MCB & STARTER COVER FITTED & DIESEL ENGINE PIPE LOCATION CHANGED. MAINTAINED SAFE CONDITION BEFORE AFTER

  12. PUMP HOUSE FLOWER UNWANTED MATERIAL REMOVED & FLOWER CLEANED. BEFORE AFTER

  13. PUMP HOUSE BEFORE – WATER PIPE LINE LAY OUT NOT PRPER AND BINDED WITH WIRE AFTER – PIPE LAY OUT CHANGED

  14. PUMP HOUSE - UNWANTED WIRING REMOVED. BEFORE AFTER