DORIS - 2 GeV Experiences in 2011

DORIS - 2 GeV Experiences in 2011 . Olympus Collaboration Meeting April 27th, 2011 F.Brinker. Startup after the shutdown , Feb. 10 th. Starting with positrons at 4.5 GeV Main magnets set to theory values Correctors set to 2010 values and zero in RF- straight

onawa
Download Presentation

DORIS - 2 GeV Experiences in 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker

  2. Startup after theshutdown, Feb. 10th • Startingwithpositronsat 4.5 GeV • Main magnetssettotheoryvalues • Correctorssetto 2010 valuesandzero in RF-straight • Empiricallyfindingtrajectory • Passingtargetcellwithoutproblems • Oneweekofbakeoutrunswithcurrentofupto 130 mA in 10 bunches

  3. Feb. 17 th: First e+ 2.0 GeV run • Setting up DORIS and transport line with theoretical optic and correctors from 4.5 GeV downscaled. • Adjusting DESY extraction energy to match transport line • Optimize DORIS injection • First time target gas filled with beam

  4. Feb. 18 th: Second e+ 2.0 GeV run • First stored beam within 1 hour after 4.5 GeV run • Optimize feedback settings, tunes, orbit • Switch back to 4.5GeV within 20 min. Feb. 21 st: Third e+ 2.0 GeV run • Switching between 4.5 and 2.0 GeV within 20 min.

  5. Feb. 22 nd: First e- 2.0 GeV run • Just using positron files with reversed polarity • Stored beam after 2 hours • Switch back to 4.5GeV e+ within 25 min.

  6. Feb. 23 nd: 4th e+ 2.0 GeV run, RF-optimization • Maximum current which can be filled depends strongly on RF-settings • RF-system isoptimized for 4.5 GeV runswith 8 cavities, 7.2 MV andabout 800 kW of RF-power • At the very low power needed for 2 GeV the RF-signals and Feedbacks are not reliable • Thereforewetriedto „detune“ thecavities – shifttheresonancefrequencyawayfromthetransmitterfrequency. This reducesthequalityfactorandincreasestheneeded RF-power

  7. Lifetimedefinedbythetargetdensity down to 0.5 hoursattwicethe nominal density • After thatrunit was decidedtoremovethetargetchamber due tothe extreme temperatureincreases

  8. Run duringserviceweek on April 14 th • Switching to 2.0 GeV within 20mins. Using the files from February • 8 Cavities detuned by defined phase ( 4 Cavities at the limit of tuning!) • Long. FB working with 2 amplifiers now → Lower cavity voltage also means longer bunches and less transient heating …

  9. Summary • The new Olympus opticcouldeasilybeestablishedandworkeswell also for thesynchrotron light users • Longitudinal instablitieslimitthe max. stable beam currentat 2.0 GeV ( nootherlimitsobserved so far ) • Obviouslythe RF detectorsand RF-feedback loopsare off theirlimits • Detuningofthecavitiesandthusincreasingthe RF-power significantlyincreasesthecurrentlimit • Over 7 hoursnoneofthefamous „dustevents“ couldbeobservedwithelectrons