I-39, CTH B Interchange Village of Plover Portage County Project ID 1166-12-00 July 30, 2013

I-39, CTH B Interchange Village of Plover Portage County Project ID 1166-12-00 July 30, 2013. Your Presenters. (Question 1 to follow). QUESTION 2. Describe your team’s makeup, roles, and relative experience; and how sub-consultants fit into the project team. 2. Your Project Team.

oneida
Download Presentation

I-39, CTH B Interchange Village of Plover Portage County Project ID 1166-12-00 July 30, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-39, CTH B InterchangeVillage of PloverPortage County Project ID 1166-12-00July 30, 2013

  2. Your Presenters

  3. (Question 1 to follow) QUESTION 2 Describe your team’s makeup, roles, and relative experience; and how sub-consultants fit into the project team.

  4. 2. Your Project Team BOLES WARNER TITLE, INC.

  5. 2. Project Team Roles I-39, CTH B Project Team

  6. 2. Project Team Roles & Experience

  7. 2. Project Team Roles & Experience • OMNNI - Project Manager:Dave Gale, PE • Responsible for coordinating project, scope, budget and timeframes • 30 years of experience in all aspects of projects • Completed projects in all WisDOT regions • Relevant experience – USH 45/CTH T Interchange and I-39 Projects • Structure project experience • Experience with multi-discipline projects

  8. 2. Project Team Roles & Experience • OMNNI - Structural Design:Judy Wilson, PE • Responsible for structure design, SSR’s, and coordination with Bureau of Structures • __ years of PM and structure design experience • Relevant experience – I-39/Reserve St. and _____________ • As PM, understands the project development process.

  9. 2. Project Team Roles & Experience

  10. 2. Project Team Roles & Experience • CORRE - Traffic Control Engineers:Dennis Olson & Chris Nies, PE • Combined 45 years of experience • WisDOT SW Region Traffic Management specialist • Developed and reviewed traffic control/construction staging plans • Relevant experience in interstate traffic phasing – I-39 at STH 153, I-39 at Patton Road, USH 12 • Experience with TMP’s, IMP’s, etc.

  11. 2. Project Team Roles & Experience

  12. 2. Project Team Roles & Experience • Stormwater Solutions Engineering –Stormwater Management:Carrie Bristoll-Groll & Gretchen Galstad, PE • Combined 38 years of experience • Specialized in stormwater management • Experience in SE and NE Regions • Relevant stormwater experience I-94 N/S Team, US-41 Brown Co

  13. 2. Project Team Roles & Experience

  14. 2. Project Team Roles & Experience BOWLES WARNER TITLE INC.

  15. 2. Project Team Roles & Experience • Experienced Staff - 8 to 34 years • Full-Service Capabilities • Experienced with multi-disciplined projects • Relevant experience • Experience taking 30% plans completion • Fully understand the project

  16. QUESTION 1 Describe your teams qualifications, experience with similar projects, and familiarity with the design and traffic staging criteria of this project.

  17. 1. Qualifications & Experience • Similar Projects

  18. 1. Qualifications & Experience • Similar Projects

  19. USH 45/ CTH T Interchange – NE Region New Interchange Master Contract w/ NE Region 40% plan PS&E New interchange of CTH T over USH 45 New ramps tying into existing USH 45 Expansion of CTH T to 4-lanes Environmental document re-evaluation Fast Track 1. Qualifications & Experience

  20. I-39/ STH 153 Interchange – NC Region Interchange Reconstr.- Staging Replacement of concrete decks Deck widening Temporary construction Developed 7 alternatives Key Staff Similarities with this project 1. Qualifications & Experience

  21. I-94 N/S Freeway – SE Region FreewayReconstr.- Stormwater Mgmt. Drainage design engineer for the corridor 3 interchanges 9 detention/retention pond designs Use of native landscaping 1. Qualifications & Experience

  22. 1. Project Understanding • I-39 Corridor Study • Identified operational and safety concerns on the corridor • Identify, develop, and design freeway and interchange enhancements • Freeway improvements • Bridge rehab and replacement • Interchange reconfigurations

  23. 1. Project Understanding • CTH B Interchange Improvements Purpose and Need • Crash history on NB ramp at I-39 merge • Steep NB entrance ramp grade • I-39 clearance issues over CTH B • Ramp terminal capacity and traffic control improvements req’d to meet future LOS

  24. 1. Project Understanding • CTH B Interchange Improvements Concept • Utilize the current study information to develop the proposed improvements • Develop the 30% plans final PS&E • Supplement the environmental document as required (similar to USH 45) • Design to satisfy the purpose and need

  25. 1. Project Understanding • Project Understanding • Multi-disciplined Project:

  26. 1. Project Understanding • Overall concept • Reconfigure to a loop ramp • Use new ramps for traffic control during I-39 construction • Construct new structures w/ adequate clearance • Evaluate impacts to I-39 and CTH B and develop plans accordingly (env. doc. dependent)

  27. 1. Project Understanding • Overall concept • Design new ramp termini with traffic signals • Accommodate stormwater effectively • Provide street lighting • Profile/ project extent

  28. 1. Project Understanding Judy- Delete this slide?? • Structures • Ramp structures • Clearance • Etc.

  29. 1. Project Understanding - Structures • Existing Bridge – I39 over CTH B • 45” PPC Girders + 7” Slab • Desired Vertical Clearance • 16’3” • Need 16” additional clearance • OPTION 1 - Propose 2 spans with 36W” Girders – gain 6” clearance • OPTION 2 - Propose 2 spans with 28” Girders & MSE abutments – gain 14” clearance • Steel Girders L/D ratio; Need 36” steel girder for90’ span

  30. 1. Project Understanding • Existing Bridge – I 39 over CN RR 36” PPC Girders + 7” Slab • Existing Vertical Clearance – 23’-1” • New Ramp Bridge spans 49.5 – 70’ – 49.5 • OPTION 1 - 36W” PPC girders • OPTION 2 – Concrete Slab Span • OPTION 3 – Steel Girders

  31. 1. Project Understanding

  32. 1. Project Understanding Construct New Entrance Ramp Bridges to Accommodate 2 Lanes Possible reconstruction of NB & SB Mainline Bridges over CN RR Reconstruct NB & SB Mainline Bridges over CTH B

  33. 1. Project Understanding CORRE to modify this slode?? • Traffic Control and Construction Staging • Staging Concept • Maintain 2-lanes • I-39 Concept • Alternatives • Issue Areas • Ramp closures • Ramp conflict areas • Construction staging area and access issues

  34. 1. Project Understanding To be developed by Carrie- Monday • Stormwater Management • Large basin size • Etc.

  35. 1. Project Understanding • Ramp Termini • Reconfigure ramp termini to current standards • Add signals • Impact to DelMonte • Drive location • Site circulation • FE access to the south

  36. 1. Project Understanding • CTH B Construction • Impacts & limits defined by structure clearance • Accommodate Trans 75 thru MSE walls/abutments? • Coordinate with local government officials regarding lighting and CSD items to match those on the west side • Impacts to local businesses

  37. 1. Project Understanding • Miscellaneous Issues • Railroad Coordination • Spur track to DelMonte • Clearance during construction • Railroad Crossing Report • Tomorrow River Bike Trail accommodations

  38. QUESTION 3 Describe your teams project management and quality control methods.

  39. 3. Project Management/QC • Five key elements to Project Management • Initiate • Plan • Execute • Monitor and Control • Close

  40. 3. Project Management/QC • Five key elements to Project Management • Project Charter • Initiate • Plan • Execute • Monitor and Control • Close

  41. 3. Project Management/QC • Five key elements to Project Management • Project Charter • Initiate • Plan • Execute • Project Quality Plan • Monitor and Control • Close

  42. Need anything else???? Add info

  43. QUESTION 4 Describe your teams public involvement experience and those involved in the process.

  44. 4. Public Involvement • Build upon WisDOT’s process to-date • Study concept, timeframe, initial public input • Develop a sound design that analyzes issues and develops credible solutions • Evaluate impacts to businesses & public • Present information appropriately

  45. 4. Public Involvement • Present information appropriately • Competent team • Present to appropriate people, at appropriate time and format • Develop consensus based on both project and community needs: State and Local Officials Agencies Businesses Landowners • Listen, empathy, & build trust • Open to public concerns • Design adjustments

  46. QUESTION 5 Describe any other expertise or assets pertinent to the success of this project.

  47. 5. Other Expertise • Team members have experience in most phases of improvement projects • Geotechnical Expertise • Experience working with drillers (GDC) • Materials Testing Lab • Experienced Geotechnical Engineers • Real Estate Capabilities • 5 negotiators and 2 appraisers on-staff and available • Helps to address irrigation and other issues

  48. 5. Other Expertise • Quality Assurance/Control • Experienced with the NC Region Review Process • Regular team member meetings • Weekly staff meetings • PM Review • Quality Control Reviews • Constructability Reviews

  49. 5. Other Expertise • Experience 30% plan PS&E • Experience + Mentoring = NC Region Success