Construction Schedule – and * = first turns of moorings

Construction Schedule – and * = first turns of moorings. *. *. *. NSF/OOI/OOSC Workshops & Webinars – past and future. 2012 Workshops February 2012 – Pioneer Workshop, Providence, RI October 2012 – Axial Seamount Workshop, Seattle 2013 December, Irminger Sea Workshop, Boston

oona
Download Presentation

Construction Schedule – and * = first turns of moorings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Schedule – and * = first turns of moorings * * *

  2. NSF/OOI/OOSC Workshops & Webinars – past and future • 2012 Workshops • February 2012 – Pioneer Workshop, Providence, RI • October 2012 – Axial Seamount Workshop, Seattle • 2013 • December, Irminger Sea Workshop, Boston • Station Papa Predeployment Webinar, COL • 2014 Workshops, Town Halls & Webinars • Webinars – Irminger pre-webinar, Papa post-webinar • OOSC user workshop – planned • OOI additional workshops – Weller/Cowles proposal • OL/OOSC/NSF OOI town hall at Oceans

  3. Post Workshop Integration Points • Final Design for Plan B global mooring • January 2014 design review – Weller/Trowbridge/Cowles (John provided text on integration details) • Data Management Review for OOI • April 2014 – NSF external panel review • February - Cowles – DM plan to PAC & OOSC • Feb to April – Cowles input process for DM final • Comments • Input to Cowles to enable OOI DM plan • Serve on the NSF external panel

  4. Post Workshop Integration Points • Pre-deployment Irminger Sea activities • WHOI Installation Readiness Review • Cruise plan (cross calibration plans, processes, etc) • Glider mission planning (lessons learned from Papa and improvements) – ACTION to plan an Integration Point • Irminger Pre-deployment webinar • Post deployment – Irminger….. ACTION to plan