2001 ASME/API Gas-Lift Workshop. Testing and Modeling Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation Consulting. Testing and Modeling Gas-Lift Valves. Outline Gas-lift valves are important API Recommended Practice 11V2

opa
Download Presentation

2001 ASME/API Gas-Lift Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2001 ASME/API Gas-Lift Workshop Testing and Modeling Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation Consulting 2001 ASME/API Gas-Lift Workshop

  2. Testing and ModelingGas-Lift Valves • Outline • Gas-lift valves are important • API Recommended Practice 11V2 • Gas-lift Valve Performance Clearinghouse (VPC) • VPC members • Valves tested by VPC • Typical VPC results • How member companies use VPC results • Future plans 2001 ASME/API Gas-Lift Workshop

  3. Gas-Lift ValvesAre Important • Gas-lift valves are needed to: • Allow gas-lift wells to unload (work down) to the desired operating depth • Remain open and transmit enough gas to allow transfer to the next valve • Remain in good condition during unloading • Not be eroded by completion fluid • Close and remain closed when lifting from deeper • Not leak • Not allow well fluids to back flow into the annulus • Re-open when needed for re-start (kick off) 2001 ASME/API Gas-Lift Workshop

  4. API RecommendedPractice 11V2 • Prior to API RP 11V2: • Gas-lift valve open/close calculations based on steady state force/balance equation • Gas passage based on Thornhill-Craver • These didn't represent real performance in dynamic operation • Gas-lift designers were forced to use rules of thumb • API RP 11V2 published in January, 1995 • Provided standards for gas-lift valve testing & modeling • But offered no specific process to implement these standards on a routine basis 2001 ASME/API Gas-Lift Workshop

  5. Gas-Lift Valve Performance Clearinghouse (VPC) • VPC formed in 1996 as JIP (joint industry project) to test & model valves • VPC tests a gas-lift valve to determine: • When it will open/re-open under dynamic conditions • How far it will open under various upstream & downstream pressure conditions • How much gas it will transmit at each opening • When it will close under dynamic conditions • If a valve does not open, move, or close correctly, this is detected • Typically, one example valve of each type or model is tested 2001 ASME/API Gas-Lift Workshop

  6. Gas-Lift Valve Performance Clearinghouse (VPC) • Based on these tests, the VPC develops accurate gas-lift valve performance models • To develop these models, the VPC determines: • Accurate opening pressure, at operating temperature • Accurate closing pressure, at operating conditions • Flow characteristic (Cv) of valve • Load rate of bellows and/or spring • Maximum effective stem travel • These models can be used for: • Gas-lift design • Gas-lift performance analysis • Comparing actual vs. theoretical performance 2001 ASME/API Gas-Lift Workshop

  7. Original and Current Membersof the VPC • VPC Member Companies • Initial Members2001 Members • Chevron Chevron • Edinburgh Petroleum Services Exxon/Mobil (pending) • Exxon PDVSA (pending) • Shell International Shell International • Weatherford Weatherford 2001 ASME/API Gas-Lift Workshop

  8. Gas-Lift Valves Testedand Modeled by the VPC • Gas-Lift Valves and Orifices Tested/Modelled by the VPC Through 2000 • 1" IPO Gas-Lift Valves • Altec AT1-CF, Camco BK, Weatherford R-1, Weatherford R-1BL, Camco/Merla NM-16R, McMurry Macco R-1D, McMurry Macco JR-STDN, McMurry Macco C-1 • 1" PPO Gas-Lift Valves • Camco BKF-6, Camco BKR-5, Camco SRF-10, McMurry Macco RF-1, Weatherford RF-1BL • 1" Alternative Operation Gas-Lift Valves • Altec AT1-VL, Weatherford RPDV-2, Camco/Merla LNM-31R, Camco/Merla WFM-14R • 1.5" IPO Gas-Lift Valves • Camco R-20, Weatherford R-2, Camco/Merla N-17R, McMurry Macco C2 • 1" Gas-Lift Orifices • Camco NOVA, Camco DCR-DK 2001 ASME/API Gas-Lift Workshop

  9. Typical VPC Gas-Lift Valve Performance Plot • Typical VPC Gas-Lift Valve Performance Plot Camco BK. 1" IPO VPC Performance Model Various Port Sizes No Choke 20/64" 16/64" 12/64" 2001 ASME/API Gas-Lift Workshop

  10. How Member CompaniesUse VPC Results • For example, in Shell: • Only gas-lift valves that have been tested and modeled by the VPC are recommended for use • Any valve found to be inadequate is not recommended for use • VPC gas-lift valve models have been implemented in WinGLUE • They are used in gas-lift design & performance analysis • In some cases, valves that have been found to be inadequate have been redesigned or replace by the manufacturer • This is clearly a win/win for all concerned 2001 ASME/API Gas-Lift Workshop

  11. Future Plans of the VPC • In 2001 and beyond, the VPC members have agreed to: • Continue gas-lift valve testing and modeling • Valves/orifices nominated by users • Selected new valves • Several valves of a type/model to check for consistency • Conduct appropriate evaluations • Potential for erosion during unloading • Effect of chokes on erosion potential • Potential life cycle of bellows • Impact of various metallurgies 2001 ASME/API Gas-Lift Workshop

  12. Other Companies areWelcome to Join the VPC • The VPC is a "joint industry project." • It is funded and controlled by its members • It is not a profit making organization • Its purpose is to advance gas-lift performance through improved gas-lift valve understanding • Any gas-lift operator or service company is welcome • The VPC meets annually, usually in October, to agree on the budget and plan for the next year • Member companies have found great value in: • Having accurate, reliable information on their valves • Having accurate performance models of their valves • Being able to screen out valves that are not satisfactory 2001 ASME/API Gas-Lift Workshop

  13. Testing and ModelingGas-Lift Valves • Conclusions • Most gas-lift wells require gas-lift valves to lift effectively • Valves do not perform as previously assumed • The steady state force balance equation is not sufficient • Thornhill-Craver can not accurately predict gas passage • To effectively design and analyze gas-lift wells, we must understand gas-lift valve performance • API RP 11V2 provides the needed standards • The VPC provides the mechanism to implement these standards for the industry 2001 ASME/API Gas-Lift Workshop