1 / 7

Specification update: IMS QTI

Specification update: IMS QTI. Steve Lay <swl10@cam.ac.uk> CARET, University of Cambridge. pwd. QTI v2.1 Public Draft (Release 2) Published July 2006 Awaiting approval for Final Publication. diff qtiv2p0.spec qtiv2p1.spec. assessmentTest assessmentResult XInclude better item templates

opa
Download Presentation

Specification update: IMS QTI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Specification update: IMS QTI Steve Lay <swl10@cam.ac.uk> CARET, University of Cambridge

  2. pwd • QTI v2.1 Public Draft (Release 2) • Published July 2006 • Awaiting approval for Final Publication

  3. diff qtiv2p0.spec qtiv2p1.spec • assessmentTest • assessmentResult • XInclude • better item templates • itemSession • a smattering of minor improvements

  4. top • IMS Project Team meeting monthly • Profiling discussion • Interoperability demonstration for end of calendar year • Final publication early 2008 • JISC e-Learning Programme projects • AQuRate (Authoring/Editing) • Minibix (Item banking) • AsDel (Test delivery)

  5. qtish$ • Hopefully I’ve left time for questions... • ...but you can always: • mail them to the QTI list http://lists.ucles.org.uk/lists/listinfo/ims-qti • mail them to me: <swl10@cam.ac.uk> • visit my QTI Tools website: http://qtitools.caret.cam.ac.uk/

  6. shutdown -h now Thank you

More Related