An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jwaneng Mine SAFETY PERFORMANCE 2011

  2. SAFETY PERFORMANCE: 2001 – 2011 YTD

  3. SAFETY PERFORMANCE 2011 YTD 2011 Near hits elevated by Near Hit reporting initiative and Cut 8 submission of Hazard elimination cards.

  4. LTIFR COMPARISON – 2010 & 2011 LTIFR 2011- 0.08 stretch achieved; LTIFR 2010 - 0.29

  5. LTIFR = Lost Time Injury Frequency Rate (includes LTI’s only; no longer includes fatalities) CIFR = Classified Injury Frequency Rate (Fatality + LTI + RWI) TRIFR = Total recordable Injury Frequency Rate (Fatality + LTI + RWI + MTI)- Splitting the NLTI this year from Jan, hence the graph started reading from Jan AIFR = All Injury Frequency Rate (Fatality + LTI + RWI + MTI + FAI)

  6. Jwaneng mine officially launched the Near Hit reporting system on the 26th Oct, 2011. A database has been developed for capturing Near Hits A significant number of employees have been trained on Near Hit reporting, data capturing and given access to the database Management Plans-Near Hits

  7. Operational control: Developed contractor SHE file which is based on the OHSAS 18001 requirements. This file has been discussed with the contractors. We will pilot the file for the next two months and implementation is planned to commence in January 2012. Visible Felt Leadership (VFL) is planned to be led by Excowith line management. Union members to be included as part of the process starting in November 2011. FRCG: Implementation gap assessment was conducted by a consultant. This will contribute to the scope of work to be conducted to meet full compliance by end of 2012. Management Plans