Public Works DepartmentLoJack Recovery System for Heavy Equipment & Rolling Stock June 24, 2014
Presentation Outline • Background • History Of Loss • Selection Criteria • Why LoJack? • Sole Source Selection Process • Installation Process • Recommendation
Background • Orange County is 5th largest municipality in the State of Florida • The operational responsibility of Public Works requires a large inventory of heavy equipment and rolling stock • Public Works Heavy Equipment & Rolling Stock • 1100 Pieces of equipment • Valued at $42 M
Background • Examples of Heavy Equipment Dozer $200,000 Tri-axle Dump Truck $140,000
Background Front End Loader $125,000 Backhoe $125,000
Background Dump Truck (6 Wheel) $75,000 Bobcat $35,000
National statistics indicate equipment theft is highest in: States with many active construction projects States with international borders or access to major shipping ports Construction in suburban regions are at higher risk Florida ranks 3rd in thenation for equipment theft History of Loss
History of Loss • Orange County has experienced an average equipment loss of $77 K per year over the last five year • Public Works equipment remains at work site overnight for efficiency
History of Loss • Equipment is subjected to vandalism and theft • Public Works in recent months has • experienced the theft of 3 pieces of equipment totaling $175 K
History of Loss • Discussions on methods for securing equipment were held with County Administration and other affected Departments in March 2014 • Staff discusseda number of options • Public Works and the • Procurement Division • determined Lo Jack as most cost • effective option
Selection Criteria • Vehicles/Equipment in high demand • Replacement Cost • Ease of removal • Ease of disposal • Impacts on project • workloads • Selection Results • 504 Pieces of equipment – Value: $25 M
Why LoJack? • Over 90% recovery rate • One time cost-$325/unit (No Monthly Fee) • Local, National and International Coverage • Supported by Orange County Sheriff and Orlando Police Department & other municipalities • 20-year history of success • No service fees • Self powered
Why LoJack? • More cost effective than a GPS tracker/device • Works in places where GPS does not • Ruggedized device for heavy equipment and large vehicles • Non-detectable wires
Sole Source Selection Process • Lo Jack Quote received March 2014 • Procurement Division posted a Sole Source Statement to determine if any other recovery system providers available • Inquiry Posted on May 21, 2014 • Closed June 2, 2014 • No Responses
Installation Process Public Works Two-Tier Approach First Tier: Heavy Equipment and Large Rolling Stock • 328 Pieces of Equipment • Cost: $106,600 • Second Tier: • Rolling Stock • 176 Pieces of Equipment • Cost: $57,200 • 504 pieces of equipment - Value $25 M • Total cost of LoJack - $163,800
Recommendation • Approval of Purchase Order M68503, Purchase ofLoJack Units in the award amount of $163,800.