1 / 4

Status of AATSR Land Surface Temperature Development

Status of AATSR Land Surface Temperature Development. Hannah Tait AATSR System Analysis Engineer (EOP-PPP) ESA ESTEC Keplerlaan 1, PO Box 299, Noordwijk, NL Hannah.Tait@esa.int. Background. 2000: LST retrieval algorithm proposed by Fred Prata (CSIRO) and discussed by the SAG.

oria
Download Presentation

Status of AATSR Land Surface Temperature Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of AATSR Land Surface Temperature Development Hannah Tait AATSR System Analysis Engineer (EOP-PPP) ESA ESTEC Keplerlaan 1, PO Box 299, Noordwijk, NL Hannah.Tait@esa.int

  2. Background • 2000: LST retrieval algorithm proposed by Fred Prata (CSIRO) and discussed by the SAG. • 2001: ESA propose to support the prototyping of the algorithm within the PP (as part of the AATSR ESL contract). • May 2002: PP implementation undergoes Acceptance Tests. • July 2002: Fred Prata visits RAL. • September 2002: LST Validation Team Meeting – Valencia. • October 2002: Start of provision of L1b scenes over validation sites to RAL for processing into prototype product.

  3. Current Status • Products containing the prototype retrieval are now being supplied to the Validation Team by RAL via FTP. • L1b data have been supplied to RAL for: • Thangoo, Amburla, Hay, Dunhuang & Sonora (1 Sept to 23 Nov) • Selected overpasses over Borneo (1 Sept to 23 Nov) • Spain and Kamchatka (Nov) • Sahara and Siberia (1 Sept to 23 Nov) • Data over volunteer sites to be ordered next. • No validation results reported yet.

  4. Future Plans • Continue initial evaluation activities until Feb 03. • In parallel, start implementation of LST in the OP in Jan 03. • Convene a dedicated LST review meeting at the end of Feb 03. • If the results are good: • Offer the new retrieval to users ASAP (March/April 03). • If problems are identified: • For minor problems, open in March/April, but with a health-warning; • Correct the PP and OP in parallel and offer the product ASAP afterwards; • Stop work on the OP until the problems are resolved. • Once the retrieval becomes part of an official ENVISAT product, validation will continue within the framework of routine product quality monitoring.

More Related