ENGI 8926: Mechanical Design Project II Downhole Turbine for Drilling

ENGI 8926: Mechanical Design Project II Downhole Turbine for Drilling Research and Conceptual Design Supervisor: Dr. J. Yang G5Downhole: Bret Kenny Lida Liu Piek Suan Saw Chintan Sharma February 6, 2014. Agenda. Drilling 101 Project Overview Design Constraints Solution Alternatives

oriana
Download Presentation

ENGI 8926: Mechanical Design Project II Downhole Turbine for Drilling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENGI 8926: Mechanical Design Project II Downhole Turbine for Drilling Research and Conceptual Design Supervisor: Dr. J. Yang G5Downhole: Bret Kenny Lida Liu Piek Suan Saw Chintan Sharma February 6, 2014

  2. Agenda • Drilling 101 • Project Overview • Design Constraints • Solution Alternatives • Concept Selection • Conclusion • Forward Plan

  3. Drilling Overview Drill Pipe Mud Motor Downhole Tools Bit

  4. Mud Motors vs. Turbines Rotor Stator

  5. Project Overview • Client: Advanced Drilling Group • Purpose: Design a downhole turbine-operated assembly to power a variety of downhole drilling tools • Scope: • Turbine Selection • Component Design • Modular Design • Safety/Compliance Tools • Desired Outcome: Final design will incorporate the selection and optimization of existing components

  6. Design Constraints

  7. Phase 1 - Objectives

  8. Alternative 1: Pumps

  9. Alternative 2: Turbines Pelton Wheel Kaplan Turbine

  10. Concept Selection

  11. Conclusion

  12. SolidWorks Model

  13. Current Project Status Completed In-progress To be completed

  14. Forward Plans • Phase 2: Preliminary Design • Load Estimation (axial, torsional and lateral) • Bearing selection • Drive Shaft Design • Additional Component Selection • Transmission • Pressure Relief Valve • Seals • Generate turbine performance curves • Development of rpm and torque vs. length relationship • Flow testing

  15. Thank You!Questions?http://g5downhole.weebly.com